EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2023 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in Allentown, Pennsylvania. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; swimming pool; and swimming pool.

**As of January 27,2023, this project has not yet been awarded. A timeline for award has not yet been established.** MC Project No. 21000467A The Contractor shall be responsible for the installation of a series of water features (also referred to as spray features), and associated plumbing, controls, and electrical. All work shall be performed as indicated on the Contract Drawings and Specifications and include every aspect of work as obvious or implied and necessary to make the work complete and fully operational. The Contractor shall coordinate with the spray equipment vendor and the spray equipment manufacturers for all installation requirements and guidelines prior to bidding the project. The Contractor is also responsible for supplying all required ancillary appurtenances for the installation of the spray features, complete, in place. Questions regarding electronic submissions are welcome via email Purchasing.Agent@allentownpa.gov. Owner has selected these features to be supplied at the pool. Ifthe Contractor selects an alternate manufacturer, the features shall have the same visual look, and functionality as the features shown on the contract plans. Spray feature manufacturer shall be Vortex, or approved equal. Electrical Connections: All main power electrical connections from the exhibit controller to the valves are to be furnished and installed per NEC 680, local codes, manufacturer's recommendations, drawings, and as required by the Engineer in DIVISION 26. Water Connections: Water connection, piping, and valves required to operate the spray features are to be furnished and installed per local codes, manufacturer's recommendations, drawings, and as required by the Engineer. The Contractor shall be required to install all the manufactured equipment and water spray features, all water piping and wiring connecting the manifold and the independent features, and all footings/foundations associated with the work. Contractor shall field install a prefabricated control manifold box in the pool deck. This will allow a place where the spray features can be calibrated and a location for where the Owner can winterize the system. Contractor shall laminate a system start-up and shutdown control instruction sheet and mount inside the door ofthe mechanical room, and a complete set of instruction in a manual for mobile use. The contractor or sub-contractor must be experienced with installing this type of spray equipment and satisfy the owner and engineer of these qualifications. The contractor or subcontractor must demonstrate successful completion of at least five (5) water feature projects ofthis size and scope and be prepared to submit references upon request. Construction of a new pool facility including utility services, new admissions and restroom support buildings, pool (including pumps, filters, spray features), pool deck (including drainage), artificial turf sitting areas, perimeter fencing, site lighting and other Work indicated in the Contract Documents. It is the purpose of this Invitation to Bid to secure a contractor for construction of a new pool facility including utility services, new admissions and restroom support buildings, pool (including pumps, filters, spray features), pool deck (including drainage), artificial turf sitting areas, perimeter fencing, site lighting and other Work indicated in the Contract Documents. Questions regarding electronic submissions are welcome via email through Purchasing.Agent@allentownpa.gov. Bid Bond required DECEMBER 5, 2022 AT 4:00 P.M. Email All Questions To: www.publicpurchase.com, by the aforementioned date

Bid Results

Playgrounds / Parks / Athletic Fields

$2,789,068.00

Public - City

New Construction, Site Work

86

40

8

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Tiling, Ceramic Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
216
Bidding Soon
3,252
All Active Projects
1,488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2023

March 10, 2023

img_map_placeholder

701 N Irving St, Allentown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Irving Pool - Andre Reed Park Development

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.