BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a bridge / tunnel in Bruce Mines, Ontario. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bar River Bridge 1, 2 & 3 Replacement, 1.9 km east to 2.0 km west of Cemetery Road on Highway 638 (Sites 38S-0116/B0, 38S-0117/B0, and 38S-0121/B0). GWP 5120-20-00. TIMELINE: Design status is unavailable. Construction is currently planned for 2027 as per the owner. Updates may be available spring 2027.

Design

Bridges / Tunnels

$25,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2027

Project location map

ON-638, Bruce Mines, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.