BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fairfield Township, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

No contract will be awarded if the lowest and best Base Bid is in excess of 10% above the Engineers pre-bid estimate of cost, which is $231,000 No pre-bid meeting will be held for this project. Each Bidder is required to furnish with its proposal a Bid Guaranty in accordance with Section 153.54 of the Ohio Revised Code. Such Bid Guaranty shall be in the form of either a bond, secured by a corporate surety, in the amount of 100% of the bid amount; OR a certified check, cashier's check, or irrevocable letter of credit, made payable to the District, in an amount equal to 10% of the Bid amount. All corporate sureties shall be licensed in the State of Ohio to provide said surety. Each Proposal must contain the full name of the party or parties submitting the Proposal and all persons interested therein. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services and labor in the implementation of this project. This is an Ohio prevailing wage project. This project is fully-funded by the District. The project is described as follows: Install 560' of 12" & 580' of 6" water main and appurtenances at Morman Rd & Stahlheber Rd, including 4 connections to existing mains, 2 open-cut road crossings, and removal of a PRV vault in Hanover Township, Butler County, Ohio. No contract will be awarded if the lowest and best Base Bid is in excess of 10% above the Engineer's pre-bid estimate of cost, which is $170,000. The District will award one or more contracts, whichever is in the best interest of the District. The Southwest Regional Water District reserves the right to reject any or all bids and to waive any nonmaterial irregularities in the bidding. Bidders should address all questions to Tom Puckett at the District, 513-863-0828, PuckettT@swwater.org. The project must be complete by the end of April-2023. Contractor may begin installation of the northern, western, and southern legs of the project upon receipt of materials. Installation of the eastern leg, however, will be limited to the first 150'+- east of the 12"x6" tee, until the District completes the abandonment of the existing 4" water main that is along Morman Road. The abandonment will be complete by the end of March-2023

Award

Water / Sewer

$219,130.00

Public - State/Provincial

Paving, Site Work

7

10

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
53
Bidding Soon
1,065
All Active Projects
409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2022

December 12, 2022

img_map_placeholder

Stahlheber Rd & Morman Rd, Fairfield Township, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.