Site work and paving for a road / highway in Ithaca, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of December 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established. P.I.N. 3950.75 The proposed project provides for the construction of a new multi-use trail over the Flood Control Channel to connect non-vehicular traffic between the intersection of Cecil Malone Drive and Cherry Street on the west of the channel to the Floral Avenue Trail on the east side of the channel. The project will consist of pile supported cantilever wall abutments and a prefabricated pedestrian bridge. The project is a Unit Price contract including a Base Bid. CR Number: 2091259 Any bid received after the deadline will be rejected, regardless of the delivery method. The City is not responsible for late delivery by any carrier service. The bids will then be publicly opened and read aloud. After the bid opening (within 24 hours), the bid tabulation will be emailed to bidders, posted on the City website, and can be made available upon request. Each bid shall be accompanied by a deposit in the amount of: Five Percent (5%) of the Total Gross Sum Bid in the form of a Certified Check, Bank Draft, or Bid Bond. Cash will not be acceptable as a deposit. Bid deposits of all unsuccessful bidders shall be returned promptly upon execution of the contract with the successful bidder. Amendments can only be accomplished by means of Addenda issued by the City of Ithaca or its designee. Written questions should be addressed to Christopher Sichak, P.E., of Erdman Anthony at SichakC@erdmananthony.com and copied to Addisu Gebre at AGebre@cityofithaca.org. Questions must be received by 5:00 on October 24 , 2022. The City reserves the right to reject any or all bids and to waive any informality or technicality in any bid in the interest of the Owner. Attention of Bidders is particularly called to the requirements for ensuring that employees, applicants for employment, and contractors are not discriminated against; refer to the Contract Documents for additional information. A DBE participation goal of 6% is required as part of this contract. Each Bidder submitting a Bid to the Owner shall execute and attach thereto, the Certification regarding Equal Employment Opportunity. Although the Bidder is not required to attach such Certification by proposed sub-contractors to his Bid, the Bidder is here advised of this requirement so that appropriate action can be taken to prevent subsequent delay in sub-contract awards Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 6% Contract term: 1 YEAR

Award

Roads / Highways

$1,519,596.00

Public - City

Paving, Site Work

45

8

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Control Software
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
101
Bidding Soon
1,075
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

March 20, 2023

img_map_placeholder

Multiple Locations, Ithaca, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Black Diamond Trail Over Flood Control Channel

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.