BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Cary, North Carolina. Conceptual plans call for the renovation of a clubhouse / community center; and for site work for a playground / park / athletic field.

The Town of Cary is seeking one or more qualified firm(s) with professional design and administration services to contract the new Cary Tennis Park Masterplan and Clubhouse Improvements project. In Fall 2021, Town Council approved funding to complete a study for the tennis park clubhouse project. Staff worked with a consultant team to define programmatic needs for the clubhouse and the tennis park campus. Several options were considered; however, the removal and replacement of the existing clubhouse and defining future use of the 8.5 acres was identified to be the top option. The study concluded with schematic floor plans, elevations, and budgetary estimates that expands the existing two-story clubhouse. The conceptual masterplan completed in 2013 was discussed during the study which expands tennis park courts, parking, and other amenities onto the additional 8.5 acres site. The selected firm will first need to finalize a tennis park masterplan which will include the clubhouse, site, and utility improvements for the tennis park campus. Secondly, the Clubhouse Improvement project will consist of demolishing the existing twostory clubhouse and building a new three-story clubhouse in the original location. The top level will include offices and multi-use spaces that can be utilized during tournament events and daily operations. The main level will include public entry, pro-shop, and potential NC Tennis Hall of Fame. The lower level will include player locker rooms, lounge area, and space for building utilities. In addition to the clubhouse, a separate public restroom/storage building will be phased for construction first to temporarily facilitate operations and provide restrooms during demolition and construction of the clubhouse. The Method of Contractor Selection has not been determined at this Time. All questions related to this solicitation must be submitted in writing (via email) to the following individual: Reid Saunders, AIA, Project Manager reid.saunders@townofcary.org

Conceptual

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
44
Bidding Soon
1,228
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.