BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Sioux City, Iowa. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Rebid will be in the fall for the next year construction. No Bids Received Per Owner; The project is located on West 8 th Street from Hamilton Boulevard to Sioux Street and includes the reconstruction of West 8 th Street including utilities: sanitary sewer, water main, storm sewer; new sidewalks and fiber conduit. The reconstructed roadway will be 39-foot-wide with parallel parking on both sides. Each bid must be made on a form furnished by the City and must be accompanied by a bid bond, a cashier's check or certified check of an Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City Treasurer of the City of Sioux City, Iowa. The check or draft may be cashed by the City Treasurer as liquidated damages in the event the successful bidder fails to enter into a contract within the ten (10) days after notice of award and post bond satisfactory to the City ensuring the faithful fulfillment of the contract. The contract will be awarded to the lowest responsive, responsible bidder. However, the City reserves the right to reject any or all bids, re-advertise for new bids and to waive informalities that may be in the best interest of the City. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa and to Iowa domestic labor. The Notice of Public Hearing will be published in the Sioux City Journal on October 15, 2022, and October 22, 2022. As of August 31, 2023, no new information available.

Final Planning

Roads / Highways

$3,084,503.00

Public - City

Paving, Site Work

63

8

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
57
Bidding Soon
541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

August 5, 2024

Project location map

W 8th St, Sioux City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.