Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 29, 2023 at 7:00 PM
Updated October 1, 2024
Site work, paving and new construction of a mixed-use development in Littleton, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a water / sewer project; and water / sewer project.
As of August, 2023, construction is underway and expected to take 2 years to complete. The project includes the construction of the new Littleton Water Resource Recovery Facility to be located at 242 King Street with an initial capacity of 208,000 gallons per day (average daily flow), including but not limited to: site work, yard piping, equalization tank, influent pumping station, process building, including screening room, biological tanks, membrane bioreactor treatment system, and effluent pumping station The Contract Time shall be 550 Calendar Days commencing twenty days following the Effective Date of the Agreement. Questions or clarifications regarding this IFB should be submitted in writing to: johnstonkm@cdmsmith.com. Each General Bid and Sub-Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by Bid Securities in the amount of five percent of the bid. The following are the filed Sub-Bids required for this work: 1. Masonry Work 2. Miscellaneous & Ornamental Iron 3. Waterproofing, Dampproofing, and Caulking 4. Metal Windows 5. Glass & Glazing 6. Resilient Floors 7. Painting 8. Fire Protection 9. Plumbing 10. HVAC 11. Electrical The estimated project cost is $19,000,000. A bid deposit in an amount equal to 5% of the total amount of the bid will be due with the bid, in the form of a certified check, bid bond or cashier's check. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the General Bids. A payment bond in an amount equal to 100% of the total amount of the bid and a performance bond in an amount equal to 100% of the total amount of the bid will be required for the successful bidder. The surety on such bonds shall be a surety company qualified to do business under the laws of the Commonwealth of Massachusetts and satisfactory to the Owner Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. LWD reserves the right to reject any and all bids, to waive informalities and minor irregularities in bids received, if it is deemed to be in the best interest of the LWD to do so *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Under Construction
Water / Sewer
$19,996,194.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2023
August 7, 2023
242 King St, Littleton, MA
Related To This Project
Littleton, MA
Bid Date: Sep 26 2019
Littleton, MA
Bid Date: Mar 01 2023
Littleton, MA
Bid Date: Jan 06 2023
Littleton, MA
--
Littleton, MA
Bid Date: Mar 03 2021
Littleton, MA
Bid Date: Feb 24 2021
Littleton, MA
Bid Date: Aug 05 2020
Littleton, MA
Bid Date: Aug 12 2020
Littleton, MA
Bid Date: Oct 12 2022
Littleton, MA
Bid Date: Mar 02 2023
Littleton, MA
Bid Date: Oct 19 2022
Littleton, MA
Bid Date: Sep 01 2022
Boston, MA
Bid Date: Oct 12 2022
Franklin, MA
Bid Date: Oct 05 2022
Franklin, MA
Bid Date: Oct 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.