Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Herndon, Virginia. Conceptual plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; 30-space sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
FY24 Haley Smith Irrigation System Replacement: This project replaces the irrigation systems at Haley Smith soccer, baseball, and softball fields that were installed in 1997. The useful lifespan of the irrigation system is 20-25 years. *The scope of this project may change if the soccer field is eliminated from the project due to the proposed conversion to an artificial turf field, but the other two fields would still require replacement. FY27 Bready Park Synthetic Soccer Field Replacement: After their life expectancy of 8-10 years, artificial turf fields typically require replacement to ensure proper performance and safety. This project replaces the artificial turf and fill which may reach the end of its useful life expectancy in FY2026. This estimate replaces the synthetic turf and does not include any associated repairs or replacement costs for other amenities. The field is 380 feet by 220 feet (83,710 square feet). The estimated 2022 replacement cost is $6.50 per square foot for an estimated replacement cost of $544,115. An assessment in FY25 is recommended to ascertain compaction, infill levels, drainage, seam durability, etc. and determine if/when replacement is due. FY27: Haley Smith Park is located on the east side of Van Buren Street, north of Herndon Parkway. This proposal, following the redevelopment of the Herndon Transit-Oriented Core (HTOC), is to replace the Haley Smith natural turf with synthetic grass to increase playability and help offset the county-wide need for rectangular fields. This project includes the necessary irrigation and storm sewer modifications, as well as adding lights to the field, which is estimated at $282,000 in 2020 prices. Operating costs include purchasing a grooming machine and the appropriate goals, corner flags, etc. at $10-20,000, plus an equipment storage shed. Funding is proposed to come from HTOC proffers including 555 Herndon Parkway approved proffer. Increasing use will also increase demand for parking. The field is 380 feet by 220 feet (83,600 square feet). The estimated field conversion cost is $17 per square foot for an estimated conversion cost of $1,425,000. FY28: The expected increase in use of Bready Park and the Community Center warrants the expansion of the parking lot by adding 30 spaces between Ferndale Ave. and the tennis courts. This section would be connected to both the softball drive and the community center drive to improve traffic flow, estimated at 2019 costs. $5000 Design in FY27. As of December 8, 2023, Project is in Town of Herndon-Capital Budget Fiscal year 2024. Project schedules have changed. Construction is currently scheduled for FY2025-2028.
Conceptual
Playgrounds / Parks / Athletic Fields
$2,812,500.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
814 Ferndale Ave, Herndon, VA
Related To This Project
Herndon, VA
--
Herndon, VA
--
Herndon, VA
Bid Date: Jan 18 2023
Herndon, VA
--
Herndon, VA
Bid Date: Jul 27 2022
Herndon, VA
--
Herndon, VA
--
Herndon, VA
Bid Date: Dec 19 2022
Herndon, VA
Bid Date: Apr 15 2021
Herndon, VA
Bid Date: Oct 28 2022
Lynchburg, VA
Bid Date: Mar 15 2023
Roanoke, VA
Bid Date: Oct 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.