EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Melrose Park, Illinois. Completed plans call for the renovation of a educational facility.

Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable Board of Education, Maywood-Melrose Park-Broadview School District 89, Melrose Park, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in-formalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Attendance shall be taken at the site to ensure that all contractors have visited the site. Completion Date: August 4, 2023. The Project consists of exterior door/curtain wall replacement and interior door/frame/keying replacement at multiple schools listed below for Maywood-Melrose Park-Broadview School District 89, 906 Walton Street, Melrose Park, IL, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by StudioGC, dated October 13, 2022. 1. Emerson Elementary School, 311 Washington Blvd., Maywood, IL 60153 2. Garfield Elementary School, 1514 S. 9th Ave., Maywood, IL 60153 3. Irving Middle School, 805 S. 17th Ave., Maywood, IL 60153 4. Jane Addams Elementary School, 910 Division Street, Melrose Park, IL 60160 5. Lincoln Elementary School, 811 Chicago Ave., Maywood, IL 60153 6. Melrose Park Elementary School, 1715 W. Lake Street, Melrose Park, IL 60160 7. Roosevelt Elementary School, 1927 S. 15th Ave., Broadview, IL 60155 8. Stevenson Middle School, 1630 N. 20th Ave., Melrose Park, IL 60160 9. Washington Dual Language Academy, 1111 Washington Blvd., Maywood, IL 60153 B. Scope: The Work includes the work of all trades required; and all the labor, materials, and equipment necessary and incidental to the construction and completion of the Work.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

39

16

17

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
193
Bidding Soon
2,217
All Active Projects
1,069
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

June 2, 2023

img_map_placeholder

Multiple Locations, Melrose Park, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Door Replacement Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.