Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a civil project in Tustin, California. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.
The work consists of 1. Supply and install the influent pipeline to connect four offsite wells to the PFAS water treatment system located at the City s Main Street Facility. 2. Supply and install effluent pipeline from Main Street Facility to City s distribution system 3. Take delivery of and install District furnished Dual Media Pressure Vessel PFAS water treatment system at the City s Main Street Facility including pressure testing, disinfection, and bacteria testing. Please be advised that the Contractor will be responsible for providing the anchorage design and hardware for the District furnished Dual Media Pressure Vessels. This design shall be sealed by a Structural Engineer licensed by the State of California. 4. Furnish and install prefilter systems for IX systems including filter media. 5. Furnish and install water treatment plant structural concrete: construct structural concrete for the water treatment system. 6. Connect the influent pipeline to the water treatment prefilters and these to the PFAS treatment trains and these to the existing reservoir: furnish and install epoxy lined and coated piping, epoxy coated cement lined ductile iron piping, and PVC C900 piping. 7. Furnish and install the ion exchange nitrate removal system, including media regeneration system with all necessary appurtenances. Includes pressure testing, disinfection, and bacteria testing. Please be advised that the Contractor will be responsible for providing the anchorage design and hardware for IX vessels. This design shall be sealed by a Structural Engineer licensed by the State of California. 8. Connect the onsite wells to the ion exchange nitrate removal system and the treated water to the existing reservoir: furnish and install epoxy coated cement lined ductile iron piping, PVC Schedule 80 piping, and PVC C900 piping. 9. Remove the existing booster pumps, piping and appurtenances in the Booster Pump Station. Furnish and install new pumps, piping and appurtenances to replace existing. 10. Connect the new booster pump station discharge header to the existing distribution system: furnish and install epoxy lined and coated piping and PVC C900 piping. 11. Remove existing chlorinators, chlorine scrubber and corresponding appurtenances. Furnish and install new sodium hypochlorite storage and feed system and appurtenances to replace existing. 12. Complete all paving and site improvements including, but not limited to: grading, concrete paving, asphalt paving, fencing, gates, driveway aprons, and drainage at the Main Street Facility. 13. Electrical and Instrumentation: furnish and install new electrical service, service entry, padmounted switch, transformer, main breaker, MCCs, VFDs, ATS, and related foundation, conduits, conductors, handholes and instrumentation equipment at the City s Main Street Facility, modify existing electrical and instrumentation equipment for the new water treatment systems. Instrumentation and control systems shall be integrated with the existing SCADA system. Each Bid shall be accompanied by one of the following: a certified or cashier's check, or bid bond in an amount not less than ten percent (10%) of the total bid price, payable to the Orange County Water District, as a guarantee that the Bidder, if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price, furnish a Labor and Material Bond in an amount not less than one hundred percent (100%) of the total bid price, and furnish certificates evidencing that the required insurance is in effect in the amounts set forth in the Insurance Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Provisions. WAGE RATE: As required by Section 1773 of the California Labor Code, the Director of the Department of Industrial Relations of the State of California has determined the general prevailing rates of wages in the locality in which the Work is to be performed. The prevailing wage determinations are available at the following electronically. The Contractor and any subcontractor under it shall not pay less than the specified prevailing rates of wages to all workers employed in the execution of the Contract. All questions relative to this project prior to the opening of bids shall be directed, in writing, to the Engineer for the project: ORANGE COUNTY WATER DISTRICT 18700 Ward Street Fountain Valley , CA 92708 Mailing Address: P.O. Box 8300 Fountain Valley , CA 92728-8300, Attention: Fernando Almario, P.E. Telephone: 714/378-8220 Facsimile: 714/378-3373 The Orange County Water District Reserves the Right to Reject Any or All Bids, and to waive any informality in any Bid.
Award
Water / Sewer
$19,771,700.00
Public - County
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 29, 2022
January 30, 2023
235 E Main St, Tustin, CA
Related To This Project
Tustin, CA
Bid Date: Nov 14 2022
Tustin, CA
Bid Date: Oct 18 2022
Tustin, CA
Bid Date: Oct 26 2022
Tustin, CA
Bid Date: Nov 03 2022
Tustin, CA
Bid Date: Oct 28 2022
Tustin, CA
Bid Date: Dec 08 2022
Tustin, CA
Bid Date: Oct 14 2022
Tustin, CA
Bid Date: Nov 10 2022
Tustin, CA
Bid Date: Oct 19 2022
Tustin, CA
Bid Date: Aug 02 2023
Tustin, CA
Bid Date: Oct 06 2022
Walnut, CA
Bid Date: Nov 22 2022
Riverside, CA
Bid Date: Oct 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.