Demolition, site work and addition to a water / sewer project in Portland, Tennessee. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The scope of work consists of the following: Addition of an influent flowmeter in a precast vault with hatch and removal of existing influent flowmeter; Addition of a diesel fuel tank and proper demolition of older fuel tank; Addition of a new MCC and new electrical panels in a prefabricated fiberglass electrical building with one set of double doors, one single door, and electrical and HVAC system; Addition of second rotary screen with screenings press and grit removal system with grit classifier including elevated walkway with handrails; Modifications to the two existing SBR basins; Addition of a third SBR basin, complete; Demolition of three existing blowers and placement of five new blowers in an existing blower building; VFDs for the five blowers, to be located in the new electrical building; Modifications to an existing EQ tank including new EQ pumps and valves and controls, and added walkways and a fabric shade cover system; Addition of a tertiary rotary disk filter system; Addition of a chlorination/ de-chlorination concrete basin with associated blowers and aeration grid, instruments and chemical feed points; Addition of chlorine gas scales and chlorinator in the existing chlorine feed building; Addition of blowers and aeration grid in existing digestor; Poly Aluminum feed system consisting of bulk tank and day tank on a scale and duplex feed skid, in a prefabricated fiberglass building with one double door and one single door, and plumbing, HVAC and electrical systems; Plant water pump skid in a prefabricated fiberglass building with three double doors and electrical room, with ventilation and electrical; New plant water loop piping with new valves and yard hydrants; All interconnecting yard piping and valves; Site work including grading, drainage, asphaltic paving and concrete sidewalks, and fencing; Upgraded site lighting system; All electrical and controls wiring to fully complete the system; Local and Master control panel modifications and programming; Any/All other work which could be considered incidental to completion of the project as shown on the Plans. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following Hethcoat & Davis, Inc., 278 Franklin Road, Suite 200 Brentwood, TN 37027 Failure to pay the plan deposit and obtaining Contract Documents from locations other than Hethcoat & Davis, Inc. will result in Bidder not being considered and Bid will not be accepted. The Owner reserves the right to waive any informalities or to reject any or all Bids. Each Bidder must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All Bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. No Bidder may withdraw his Bid within 60 days after the actual date of the opening thereof. This project consists of: 1. Addition of an influent flowmeter in a precast vault with hatch and removal of existing influent flowmeter. 2. Addition of a diesel fuel tank and proper demolition of older fuel tank. 3. Addition of a new MCC and new electrical panels in a prefabricated fiberglass electrical building with one set of double doors, one single door, and electrical and HVAC system. 4. Addition of second rotary screen with screenings press and grit removal system with grit classifier including elevated walkway with handrails. 5. Modifications to the two existing SBR basins. 6. Addition of a third SBR basin, complete. 7. Demolition of three existing blowers and placement of five new blowers in an existing blower building. 8. VFD's for the five blowers, to be located in the new electrical building. 9. Modifications to an existing EQ tank including new EQ pumps and valves and controls, and added walkways and a fabric shade cover system. 10. Addition of a tertiary rotary disk filter system. 01010 PROJECT SUMMARY - 2 11. Addition of a chlorination/ de-chlorination concrete basin with associated blowers and aeration grid, instruments and chemical feed points. 12. Addition of chlorine gas scales and chlorinator in the existing chlorine feed building. 13. Addition of blowers and aeration grid in existing digestor. 14. Poly Aluminum feed system consisting of bulk tank and day tank on a scale and duplex feed skid, in a prefabricated fiberglass building with one double door and one single door, and plumbing, HVAC and electrical systems. 15. Plant water pump skid in a prefabricated fiberglass building with three double doors and electrical room, with ventilation and electrical. 16. New plant water loop piping with new valves and yard hydrants. 17. All interconnecting yard piping and valves. 18. Site work including grading, drainage, asphaltic paving and concrete sidewalks, and fencing. 19. Upgraded site lighting system. 20. All electrical and controls wiring to fully complete the system. 21. Local and Master control panel modifications and programming. 22. Any/All other work which could be considered incidental to completion of the project as shown on the Plans.

Award

Water / Sewer

$14,528,900.00

Public - City

Addition, Demolition, Site Work

112

24

63

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
89
Bidding Soon
1,099
All Active Projects
485
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2022

January 16, 2023

November 6, 2024

img_map_placeholder

To Be Determined, Portland, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.