EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Pittsburgh, Pennsylvania. Completed plans call for site work for a road / highway.

As of January 20, 2023, project was awarded to Power Contracting Company, awarded amount is $7,995,797.55. Installation of Intelligent Transportation Systems Between Milepost 9.7 and Milepost 99.4 and Milepost B-15.8 and Milepost B-30.6 and Milepost G-1.8 and G-12.5 and M-4.5 and M-38.6 in Lawrence, Beaver, Allegheny, Westmoreland, Fayette, and Washington Counties This project provides for the necessary labor, material, equipment and work to install Twelve (12) completely functional Dynamic Message Sign (DMS) Systems, Twenty (20) completely functional Closed Circuit Television (CCTV) systems, One (1) Roadway Weather Information System (RWIS), and furnishing and installation of foundations, structures, power, and communication conduit and wiring. All DMS, controllers and DMS cabinets will be supplied by the Commission. Also included are guide rail installation, erosion and sedimentation control and Maintenance and Protection of Traffic required to construct the ITS devices and network. Work items include, but are not limited to: 12 EA Install Full Color Full Matrix DMS Type 1, Centermount 12 EA Centermount DMS Sign Structures 3,425 LF Guide Rail 7 EA Permanent Impact Attenuating Devices 38,435 LF HDPE Conduit, various sizes 18,755 LF Micro-duct Conduit, various sizes 23,325 LF Single Mode Micro-Fiber cable, 24 strand 37,720 LF Trench and Backfill, various types 2,395 LF Directional Boring 187 EA Junction Boxes, various types 85 LF Drilled Caisson Construction in soil 59 LF Drilled Caisson Construction in rock Milepost 9.7 is located at the New Castle Interchange, Exit 10, and Milepost 99.3 is located approximately 8.3 miles east of the Donegal Interchange, Exit 91. Milepost B-15.8 is located approximately 0.5 miles west of the Mount Jackson Interchange, Exit B17, and milepost B-30.6 is located approximately 0.9 miles west of the Chippewa Interchange, Exit B31. Milepost G-1.8 is located approximately 1.2 miles north of the Arona Rd Interchange, Exit G1, and milepost G12-5 is located at the Bouquet/Forbes Rd Interchange, Exit G-12. Milepost M-4.5 is located is located at the Smithfield mainline toll plaza and milepost M-38.6 is located approximately 0.6 miles south of the Charleroi Interchange, Exit M39. The overall project work takes place in Lawrence, Beaver, Allegheny, Westmoreland, and Fayette Counties, Pennsylvania. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically by registered business partners.

Award

Roads / Highways

$7,995,798.00

Public - State/Provincial

Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Erection
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
106
Bidding Soon
991
All Active Projects
468
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2022

January 23, 2023

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Installation of Intelligent Transportation Systems

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.