EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 1, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Manchester Township, New Jersey. Completed plans call for the renovation of a 80,858-square-foot educational facility.

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. Window Replacement at Ridgeway Elementary School. B. Type of Contract: 1. Project will be constructed under a single prime contract. Neither the Owner, nor the Architect will assume any responsibility for bids mailed or misdirected in delivery. No bid may be withdrawn for a period of sixty (60) calendar days from the opening of the bids. Should you have any questions, please contact the Architect's office at 866-974-7666. All bidders must use and complete all bid forms provided in the manner designated and must comply with all requirements contained in the instructions and specifications. Bids shall be placed in a sealed envelope with the name of the project clearly marked on the front of the envelope and accompanied by a bid guarantee in the form of a Certified Check, Cashier's Check, or Bid Bond in the amount of Ten Percent 10% of the bid, but not more than $20,000. SINGLE-OVERALL CONTRACT BID Sealed Bid Proposals shall be received as follows: The bidder shall be classified by the New Jersey Department of the Treasury, Division of Property Management and Construction (DPMC) in the following trade(s): C008 General Construction or C009 General Construction/Alterations and Additions or C012 - Windows Subcontractors named in the Form of Bid Proposal for Structural Steel, Plumbing, Heating Ventilating and Air Conditioning, and/or Electric, who perform any work on the Project must be prequalified prior to the submission of bids, pursuant to the State of New Jersey Division of Property Management and Construction (DPMC). Each bid must be accompanied by proof of Contractor's DPMC classification status. Bidders are required to comply with requirements of N.J.S.A. 10:5-1 et seq., "The Law Against Discrimination," and affirmative action, N.J.S.A. 10:5-31 et seq. and N.J.AC. 17:27-1 et seq. All bidders and their subcontractors shall be registered with the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq. Prior to award, bidder must provide a Certificate issued by the New Jersey Department of Labor, pursuant to the Public Works Contractor Registration Act, and a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue for the bidder and all subcontractors (i.e., "named subcontractors") whose prices are included in the Contractor's bid. Pursuant to P.L. 2009, c.315 and/or N.J.S.A. 52:32-44 Business Registration of Public Contractors, Prior to award, bidder and all named subcontractors must provide a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue of the Bidder and must include that of all subcontractors i.e., "named subcontractors", whose prices are included in the Contractor's bid. If not included with the bid, these documents must be submitted prior to award. The Owner reserves the right to reject all bids and waive any minor informality in the bidding process in accordance with the law, if it is in the best interest of the Owner. The Contract, if awarded, shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid requirements. No bid shall be deemed accepted until the adoption of a formal resolution by the Owner.

Award

Educational

$622,000.00

Public - City

Renovation

11

14

8

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
259
Bidding Soon
4,232
All Active Projects
1,937
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

2861 Ridgeway Rd, Manchester Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Window Replacement at Ridgeway Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.