BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Greensboro, North Carolina. Conceptual plans call for the renovation of a water / sewer project.

Replace components of Mitchell Treatment Plant filter bottoms as required to maintain integrity. Leopold IMF caps will need to be replaced at a minimum with the improved slotted caps. Inspect filter bottoms for air scour integrity and effluent channels for structural soundness. One filter set can be refurbished every six months which spreads cost over three years. Leopold IMF caps have a track record of failure after 10+ years. Our caps started coming apart around year 12. We modified our installation with oversized fasteners which corrected the issue but are now approaching 20 years. Failures can be expected within a few years. Cost estimate is based on $750,000 per filter set but could be lower if only the caps need to be replaced. As of November 14, 2023, this project is included in the FY 23-24 to FY 28-33 CIP and funding for construction is allotted for FY 25-26. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
65
Bidding Soon
1,532
All Active Projects
570
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

1041 Battleground Ave, Greensboro, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.