BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work for a water / sewer project in Sidney, Ohio. Completed plans call for site work for a water / sewer project.

Aldrin Drive Water Main Replacement The project consists of the replacement of water main along Aldrin Drive between Lunar Street and Apollo Street. Any and all questions regarding the referenced project must be submitted through the Bid Express website f the bidder experiences difficulties with the electronic bidding service, please contact the Bid Express support team (1-888-352-2439, M-F 7am-8pm EST or support@bidexpress.com) at least 72 hours prior to the bid opening. The Contractor shall be required to pay not less than the minimum wage rates established by the Department of Industrial Relations of the State of Ohio for Heavy Highway Construction. All proposals shall be accompanied by a bond in the sum of at least ten percent (10%) of the Bid to the satisfaction of the City Manager or by a certified check made payable to the City of Sidney in the sum of at least ten percent (10%) of the Bid on a solvent bank, as a guarantee that if the Bid is accepted, a Contract will be entered into and its performance properly secured within seven (7) working days after written notification of acceptance has been given. When a Bidder bids on alternate types of construction, only one certified check or bond of the amount fixed in the legal notice will be required. When a proposal is accepted, and within seven (7) days thereafter, the Bidder whose proposal is so accepted will be required to enter into a Contract in the form hereto attached and give a bond in the sum equal to one hundred percent (100%) of the proposal, executed by an authorized surety, guaranty or trust company, or companies, to the satisfaction of the Owner. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Water / Sewer

$256,699.00

Public - City

Site Work

15

3

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
154
Bidding Soon
2,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.