Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Birmingham, Alabama. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The general scope of the work includes but is not limited to: sealing and striping existing parking lots, replacing single and double LED fixtures, and pressure washing existing concrete pavement at Health Department facilities in various counties in Northeast Alabama. Scope of work for Dekalb County also includes minor grading and drainage improvements, concrete work, and paving. Prequalification is required for this project. Only General Contractors who have been approved to bid pursuant to the pre-qualification procedures and criteria established by the Owner, will be eligible to bid the Project. The pre-qualification procedure is intended to identify responsible and competent bidders relative to the requirements of the Project. The Owner reserves the right to waive technical errors in applications or abandon the pre-qualification process. Pre-qualification proposal package requirements may be obtained from the office of Robins & Morton. The deadline for receipt of pre-qualification submittals is seven (7) calendar days prior to the bid due date. Substantial Completion shall be achieved within 180 calendar days from the date of commencement of Work. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Bid Documents (Drawings and Specifications) may be examined at the Office of the Architect. Digital PDF copies of Bid Documents shall be provided to all Pre-qualified General Contractors. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. All questions referring to the actual Bid Documents shall only be submitted by email to the Architects representative. Bidders shall contact Barge Design Solutions for the email address for submitting questions and/or requesting clarifications. All questions or correspondence to the Owner shall be submitted to the Owners Program Manager. Engineer: Wesley Dawsey Barge Design Solutions 200 Clinton Avenue Suite 800, Huntsville, Alabama 35801 Wesley.Dawsey@bargedesign.com (256)533-1561 Program Manager: Attn: Kaylor McCain Robins & Morton 400 Shades Creek Parkway Birmingham, Alabama 35209 (205) 870-1000
Post-Bid
Roads / Highways
$400,000.00
Public - County
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2022
December 9, 2022
Multiple Locations, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Dec 15 2022
Birmingham, AL
Bid Date: Oct 17 2022
Birmingham, AL
Bid Date: Nov 03 2022
Birmingham, AL
Bid Date: Feb 01 2023
Birmingham, AL
Bid Date: Oct 27 2022
Birmingham, AL
--
Birmingham, AL
Bid Date: Jun 16 2022
Birmingham, AL
Bid Date: Dec 03 2020
Birmingham, AL
Bid Date: Oct 18 2022
Birmingham, AL
Bid Date: Oct 18 2022
Birmingham, AL
Bid Date: Sep 14 2022
Birmingham, AL
Bid Date: Oct 18 2022
Birmingham, AL
Bid Date: Oct 18 2022
Birmingham, AL
Bid Date: Dec 08 2022
Birmingham, AL
Bid Date: Nov 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.