BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Anaheim, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 10th, 2022, project award is anticipated for February 2023. Shortlist will be only be available after award. The Orange County Transportation Authority (OCTA) invites proposals from qualified firms to provide public outreach services for the State Route 91 Improvement Project between State Route 57 to State Route 55. The Orange County Transportation Authority (OCTA), in cooperation with the California Department of Transportation (Caltrans), proposes to improve State Route 91 (SR-91) between Lakeview Avenue and just west of State College Boulevard in Anaheim (Project). SR-91 is a major east-west corridor connecting Riverside County with Orange and Los Angeles counties. The Project area includes the cities of Anaheim, Fullerton, Orange, and Placentia, and extends approximately 5.6 miles. Known as Project I in the OC Go program (also known as Measure M), the $425.6 million Project is funded through a combination of local, state, and federal funds. The Project includes improvements to SR-91 in both directions that will affect interchanges, connectors, ramps, and utilities. A new on-ramp structure from Lakeview Avenue to southbound State Route 55 will be constructed. Four (4) bridges will be replaced and ramps will be modified at several interchanges, bringing them up to the latest design standards where possible and making them safer for pedestrians, bicyclists, and motorists. In addition, the westbound SR-91 connector to northbound and a portion of southbound State Route 57 will be reconstructed, a new Orangethorpe bypass ramp will be constructed, multiple retaining walls and sound walls will be built, and new lighting, signs, and other safety elements will be installed or improved. The Project will improve traffic operations and reduce congestion on SR-91 considering existing and future travel demand. The Project is being designed and constructed in three (3) segments. Construction on the first segment is currently scheduled to begin in early 2024. Project construction is anticipated to be completed by late 2028.

Award

Roads / Highways

$1,842,755.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
86
Bidding Soon
2,317
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2022

January 1, 2024

img_map_placeholder

CA-91, Anaheim, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.