BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Brockport, New York. Conceptual plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

It is the intent of The State University of New York College at Brockport to hire a consultant to provide design services for a maintenance and salt storage facility. The campus stores its supply of snow/ice melt materials in a small wood framed, open-air structure adjacent to the canal at the west side of the Chapman Service Building (no. 35). Similarly, seasonal maintenance equipment is stored outdoors where it is continually exposed to the weather. That said, a new salt and maintenance storage facility(s) is needed to meet current environmental, life and safety standards, and to provide protection of our ground and maintenance equipment. Preliminary discussions include the use of prefabricated structure(s) located directly south of the Whited baseball/Softball Complex (at the previous campus laydown area) on Commencement Drive. The current contractor is cleaning up this laydown area/site and enhancing the berms. Included is the modernization and consolidation of the existing fuel dispensing equipment with a new above ground system at the west side of the Chapman Service Building. This work is to include the removal of the previously abandoned underground fuel storage tanks near the southeast area of Chapman and potential soil remediation. This shall be an accelerated design component and separate bid package for this project. Initial scope of services shall include a schematic study based on feedback gathered from the end uses, scoping recommendations and environmental testing. The consultant shall include comprehensive design services including but not limited to: Civil, Architectural, Structural, Engineering, Environmental, Land Surveying Services and Estimating. A review of the existing drawings and other information as well as a field visit(s) to confirm existing conditions are necessary as are design/interview meetings. Address College review comments during the various phases of the design process. The consultant shall prepare a comprehensive set of construction drawings and project manual(s) and prepare a comprehensive Topographic Survey of the proposed building/spoils site and the Chapman Complex. Varying degrees of bidding and construction administration support will be needed. Services shall abide by the design directives established by the campus and the State University Construction Fund. The work includes: The proposed building/spoils site will include site/parking layout, grading, and pavement design. Fueling storage and dispensing operations: Consolidate fueling operations to the west side of Chapman. All fuel storage tanks will be above ground. Assumed that some of the existing tank and pump components will be reused. Remove existing below grade fuel storage tanks and test soil for contamination. Utilities to the proposed building site include: Water main extension from the baseball field complex; include backflow prevention. Electrical service from New Campus Drive. Include power to the Baseball/Softball facility. Site storm drainage system as required. No sanitary sewer or septic work is anticipated. Assume site disturbance for the proposed building site will be more than 1 acre and a Stormwater Pollution Prevention Plan (SWPPP) will be required. Evaluate the need for a SHPO submission. Prepare soil screening and sampling related to the above ground storge tank (AST) relocation Assist SUNY Brockport with the completion of necessary AST closure and/or registration pursuant to USEPA/NYSDEC PBS policies. Prepare a Wetlands Assessment. Provide a Hazardous Materials Assessment. Assumes that the Salt Storage and Facilities Storage building(s) are pre-engineered fabric structures; supported by concrete walls and foundations. Guide the College in the selection of the structures. Alternates shall include: in-slab heat with ground source heat pumps, roof mounted photovoltaic panels if a solid roof structure is decided. Please contact Mark Stacy, mstacy@brockport.edu, if you would like a copy of the RFQ. Contract term: Construction completion anticipated for August 2024.

Conceptual

Warehouse / Distribution - Pre-Engineered Storage Building

$2,000,000.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
83
Bidding Soon
1,870
All Active Projects
850
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

img_map_placeholder

350 New Campus Dr, Brockport, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.