Site work and paving for a road / highway in Milwaukee, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of August 3,2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Southeast Region Solicitation ID: SE-05 Anticipated Construction Cost: $9,000,000-$9,999,999 Route : STH 032N County : 40 - Milwaukee County Limit : S County Line to Forest Hill Ave The pavement needs replacement and drainage need improvement. Perpetuation to replace the pavement of approximately 5 miles of STH 32 from S County Line Road to Forest Hill Ave. within the City of Oak Creek, in Milwaukee County. Replace/update signals, evaluate and upgrade curb ramps, and investigate spot repairs to curb and gutter and islands. An overlay will be completed at STH 32 intersections with STH 100 and County Line Road The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Pavement Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Roads / Highways

$10,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
174
Bidding Soon
2,126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

Project location map

WI-32, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.