BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Canton, Georgia. Completed plans call for site work for a water / sewer project.

Contract Time: 180 days, Proposal Guarantee: 5% 1. The Contractor shall not perform work or move equipment or materials across any roadway and interfere with traffic flow on the main roads or local streets between the hours of 7:00 AM to 8:30 AM and 4:00 PM to 6:00 PM, Monday through Friday, unless approved by the Engineer. Equipment or materials moved on or across the roadway at other times shall be done in a manner so as minimize interference with traffic. 2. If night work is necessary to perform project work, a written request shall be submitted to Cherokee County and approved at least three days in advance. Working hours for night work are between 8:00 PM and 6:00 AM, Monday through Friday, unless approved by the Engineer. 3. It is the contractor's responsibility for coordination of utilities. 4. Construction signs need to be mounted. 5. Contractor shall use reduced speed limit signs per GDOT 150 to be included in cost for traffic control. 6. Temporary striping costs to be included in Traffic Control pay item. Roads should be striped as soon as possible after paving. 7. Contractor shall construct the project following Georgia Department of Transportation current standards and specifications manual, supplemental specifications, and construction standards and details. 8. There will be a 14-day cure on final lift of asphalt prior to placement of thermoplastic striping. 9. All pipe shall be reinforced concrete pipe (RCP). 10. If any additional pay items not included in the contract are deemed necessary by the Engineer, then the contractor shall negotiate a price with the County for the additional pay item. Price shall be not more than 10% greater than the current GDOT item mean price for that pay item. 11. Contractor is responsible for utility coordination and ensuring that the location of all utilities is accurate to the best of their knowledge. 12. Any detour requests must be submitted 21 days prior to road closure for review and approval. 13. Any irrigation lines cut shall be capped and flag to back of ROW. 14. Contractor has the option to build the concrete culvert in place. 15. Contractor is responsible for avoiding any utility lines over the construction of the box culvert. 16. Contractor may incur costs associated with GA Power lines due to constructability of culvert. This cost shall be added in bid price for grading complete. 17. Hembree Water Relocation Connection to City of Canton water system

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

5

3

73

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
145
Bidding Soon
2,199
All Active Projects
1,017
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2022

December 15, 2022

img_map_placeholder

To Be Determined, Canton, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.