EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 12, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a residential development in Du Quoin, Illinois. Completed plans call for the renovation of a residential development.

Proposal forms and contract documents, including plans and specifications, are on file at the office of the Housing Authority and at the office of Eggemeyer Associates Architects, Inc., 3029 South Park Ave./P. O. Box 640, Herrin, Illinois 62948; Phone No.:(618)988-2380 Additional Doc Acq Note: Partial sets may be purchased at the cost of photocopying and shipping cost upon completion of a request for partial plans/specifications form and submitting to the Architect. Documents may also be downloaded from the Architect's website for bidding purposes only. In accordance with Clause No. 9, Bid Guarantee, of the Instructions to Bidders, all bids must be accompanied by a negotiable bid guarantee in the form of a certified check or bank draft, payable to the Perry County Housing Authority, U.S. Government Bonds at par value, or a satisfactory bid bond executed by the Bidder and acceptable sureties in an amount equal to five percent (5%) of the bid. The surety company must be authorized to do business in the state where the project is located and must be acceptable to the Government. If the bid guarantee is not submitted with the bid, the PHA will reject the bid. Proposals shall be made on unaltered bid forms which are incorporated herein. All blank spaces shall be completed. Proposals shall be signed with name typed below signature. When bidder is a corporation, proposals must be signed with the legal name of the corporation followed by the name of the state of incorporation and the legal signature of an officer authorized to bind the corporation to a contract. The successful bidder will be required to furnish and pay for satisfactory performance and payment bond or bonds acceptable to the Housing Authority all in accordance with Clause No. 10, Assurance of Completion, of the Instructions to Bidders. Attention is called to the provisions for equal employment opportunity and that payment of not less than the minimum salaries and wages as set forth in the Specifications must be paid on this project. Any State rate that exceeds the corresponding Federal rate is inapplicable and shall not be enforced. All bidders shall submit with each bid, the Contractor's Affirmative Action Certification to comply with the provision for equal employment opportunity. Representations, Certifications and Other Statements of Bidders, Form HUD-5369-A shall be submitted with the bid. Bidders shall carefully examine the documents and construction site to obtain firsthand knowledge of the existing condition. Contractors will not be given extra payments for conditions which can be determined by examining the site and documents. The Housing Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty days (60) subsequent to the opening of bids without the consent of the Housing Authority. Deadline for questions - 11/2/2022 at 1:00 pm Replace designated exterior doors, including new hardware, operators, and modifications to access control system. Replace apartment entrance door hardware. Modernize existing elevators including controllers, wiring, finishes, doors and operators, and power units. Renovations to hoistway for code compliance and maintenance. Machine room upgrades include new electrical equipment, lighting, and add cooling.

Award

Residential Subdivision

$462,000.00

Public - County

Renovation

8

23

4

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pump Discharge Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
56
Bidding Soon
645
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

December 29, 2022

img_map_placeholder

To Be Determined, Du Quoin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elevator Upgrades and Exterior Door Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.