Renovation of a municipal facility in Maywood, Illinois. Completed plans call for the renovation of a two-story above grade municipal facility.
During the bid process, all inquiries must be directed in writing and emailed to the District's Purchasing Agent as follows: Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. October 26, 2022. The District seeks the following participation goals with respect to Minority-owned Business Enterprises ("MBE") and Women-owned Business Enterprises ("WBE") for this project: 24 % MBE participation goal and a 10 % WBE participation goal This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed "MBE/WBEs". Bidders requiring assistance in meeting these goals are encouraged to contact: Contract Compliance Administrator Forest Preserve District of Cook County (312) 603-8342 Email: sergio.silva@cookcountyil.gov Forest Preserve District of Cook County (the "District") is soliciting Bids for the above referenced project. The work includes, but is not limited to, removal of existing interior stair and installation of new interior exit stair and exterior balcony and other related work as specified in the plans & specifications Phone: 312-519-9614 Lori Nayman Failure to attend a mandatory pre-bid conference will result in disqualification of the bid. Submission of a Certificate of Intent to Comply with the Cook County Resident Employment is required for all construction projects over $100,000. Work shall be substantially completed within 180 calendar days from the date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 90 calendar days from the Substantial Completion date. The Contract end date is the date on which all Work shall be completed in accordance with the Contract Documents for the referenced project. (Work includes, but is not limited to, request for Final Payment and excludes any warranty related work.) If the Contractor does not employ tradesmen, the Contractor is exempt from the apprenticeship and training provisions of the Responsible Bidder Ordinance. As per the Responsible Bidder Ordinance For Construction Contracts as defined in the Forest Preserve District Code of Cook County (Code) Section 1-8- 2.S(5), all Contractors and subcontractors employing tradesmen shall be participants in active apprenticeship and training programs approved and registered with the United States Department of Labor Bureau of Apprenticeship and Training and shall submit evidence of such participation. Bonding Requirements [X] Security bid deposit [X] Surety Statement of Qualification for Bonding
Post-Bid
Municipal
$500,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2022
December 5, 2022
2199 S 1st Ave, Maywood, IL
Related To This Project
Maywood, IL
Bid Date: Nov 09 2022
Maywood, IL
Bid Date: Dec 05 2022
Maywood, IL
Bid Date: Dec 09 2022
Maywood, IL
Bid Date: Apr 13 2022
Maywood, IL
Bid Date: May 12 2022
Maywood, IL
Bid Date: Nov 09 2020
Maywood, IL
Bid Date: Apr 12 2022
Proviso School District 209 - Capital Improvements Phase 2 - Sequence 1 - BP 11D, 28A, 06K - 4740260
Maywood, IL
Bid Date: May 25 2022
Maywood, IL
Bid Date: Nov 18 2022
Chicago, IL
Bid Date: Jan 23 2023
Macomb, IL
Bid Date: Nov 10 2022
Joliet, IL
Bid Date: Feb 14 2023
Riverdale, IL
Bid Date: Sep 16 2022
Carol Stream, IL
Bid Date: Nov 18 2022
Chicago, IL
Bid Date: Oct 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.