BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pompano Beach, Florida. Completed plans call for site work for a water / sewer project.

Question Cuttoff Date & Time 11/10/2022 05:00:00 PM (ET) The City is seeking a qualified marine Contractor to furnish all labor, equipment, tools, and materials to replace a section of concrete bulkhead and marginal dock at the Alsdorf Park public boat ramp facility located at 2901 NE 14 th St., Pompano Beach, FL, 33062, on the north side of the 14 th Street Causeway along the westerly shoreline of the Intracoastal Waterway (ICWW). The section of bulkhead and dock to be replaced extends from the easterly boat ramp along the Caliban Canal to the confluence of the ICWW. The existing bulkhead is approximately 370 feet in length and comprised of concrete panels, concrete Tpiles and concrete cap supported laterally by combination of concrete batter piles and tie-back systems. The marginal dock is five (5) feet wide, approximately 350 feet in length and constructed using pressure treated timber piles and substructure with composite decking. The proposed project includes the demolition and removal of the existing bulkhead and dock and reconstruction of the bulkhead using concrete panels, concrete king and batter piles and concrete cap. As an alternate, the City is seeking a price to reconstruct the bulkhead using composite sheet pile with concrete cap and concrete batter piles. As a requirement, the bidder must provide pricing for both the concrete bulkhead and the sheet pile alternative. The City will determine which alternative method will be used. It is a requirement that the new bulkhead be constructed no further waterward than the existing wall, which will necessitate the removal of the existing bulkhead in its entirety. A small section of the new bulkhead, approximately 53 feet in length, will be offset landward of the existing bulkhead six (6) feet to allow for the installation of a 40-foot floating platform. Bulkhead construction activities will require the removal and restoration of asphalt and addition of gravel stormwater collection areas with small catch basins and jet filter discharges. Fill will be required over a section of the new bulkhead to elevate natural grades to the level of the new concrete cap.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

19

8

2

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
130
Bidding Soon
1,826
All Active Projects
815
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 17, 2022

December 19, 2022

img_map_placeholder

2901 NE 14th St, Pompano Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.