Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Marietta, Georgia. Contact the soliciting agency for additional information.
The Cobb County Department of Transportation is requesting non-cost technical proposals for Engineering Consulting Services for the above referenced projects. The current funding for this project is from the 2016 One Percent Special Purpose Local Option Sales Tax (SPLOST). However, the Cobb County Department of Transportation is seeking additional Federal and State funding support. Accordingly, the successful firm will be required to comply with all applicable Federal, State, and County rules and regulations. All engineering services shall be in accordance with Cobb County Department of Transportation Engineering Design Procedures, applicable guidelines of the American Association of State Highway and Transportation Officials (AASHTO), Georgia Department of Transportation's (GDOT) Standard Specifications for the Construction of Transportation Systems, Project Schedules, and Plan Presentation Guidelines, future Federal or State funding award including Federal Transit Administration (FTA) and Federal Highway Administration (FHWA), and all other applicable Cobb County Department of Transportation guidelines. All project deliverables must be submitted to Cobb County Department of Transportation for review and approval. All Consultants, including subconsultants, should be pre-qualified with Georgia Department of Transportation OR Cobb County Department of Transportation. Prequalification with GDOT is accepted as prequalification with Cobb County, and no additional submission is necessary. For those firms without Georgia Department of Transportation prequalification, Cobb County Department of Transportation prequalification is required. Additionally, prequalification will be required prior to contract award but not prior to proposal submittal. Deadline for Written Questions October 28, 5:00 p.m. Email: Purchasing@cobbcounty.org The study area for this project will be defined by the consultant during the project as part of the scope of services; however, generally this will include the area roughly within 1 mile centered in the 'hospital triangle' formed between the East West Connector, Floyd Road, and Austell Road, and inclusive of WellStar Cobb Hospital and the area of overlap between CobbLinc Routes 25 and 30. The study area will include all reasonably feasible locations for the construction of the South Cobb Transit Center that can provide convenience for current and future riders as well as provide efficient service for existing and foreseeable CobbLinc and regional transit operations. This will be further informed by the CobbLinc Transit Centers System Analysis and Needs Assessment Study (Phase 1 study) that is currently underway. Some elements of the site selection evaluation may need to evaluate impacts or consideration to the broader CobbLinc transit service area and/or regional transit system. Cobb County is planning the development of three multimodal transit centers to meet current and future transit ridership and operational demands. The expansion and relocation of the two existing CobbLinc transfer facilities at Cumberland and Marietta will address capacity and operational issues. A third facility will be developed to serve operations in the South Cobb area. All three facilities were identified in Cobb County's recently adopted Cobb Forward Comprehensive Transportation Plan (CTP).
Award
Roads / Highways
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2023
Multiple Locations, Marietta, GA
Related To This Project
Marietta, GA
Bid Date: Oct 17 2022
Marietta, GA
Bid Date: Oct 28 2022
Marietta, GA
Bid Date: Oct 20 2022
Marietta, GA
Bid Date: Oct 06 2022
Marietta, GA
Bid Date: Oct 20 2022
Marietta, GA
Bid Date: Nov 17 2022
Marietta, GA
Bid Date: Nov 10 2022
Marietta, GA
Bid Date: Oct 18 2022
Marietta, GA
Bid Date: Nov 18 2022
Marietta, GA
Bid Date: Nov 15 2022
Marietta, GA
Bid Date: Jan 26 2023
Marietta, GA
Bid Date: Oct 19 2022
Marietta, GA
Bid Date: Oct 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.