Site work for a mixed-use development in Sevierville, Tennessee. Completed plans call for site work for a golf course; and water / sewer project.

Bids must be submitted on the complete project and must be enclosed in a sealed envelope, addressed to City of Sevierville, 120 Gary Wade Blvd, Sevierville, Tennessee 37862 or P.O. Box 5500, Sevierville, Tennessee 37864-5500. Outside of the envelope must be marked "Bid for 36-Inch Sanitary Sewer Interceptor Rehab". Envelope must also bear on the outside, the name of the Bidder, Bidder's address, and Bidder's license number with expiration date (please refer to Document 00 21 13, Instructions to Bidders). All bids must be made on blank forms provided and included in the bound document or as provided by Addendum prior to Bid. The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete in place and ready to operate the following: 1. Rehabilitate 19,347 linear feet of 36-inch Ductile Iron Pipe Gravity Sewer Interceptor Main using Cured-In-Place-Pipe. 2. Install primary and secondary bypass pumping and piping system to divert flow from upstream sewer to Davis Lane Pump Station or to bypass connection at Davis Lane Pump Station. 3. Perform Level C subsurface manhole rehabilitation on forty-eight (48) manholes along the 36-inch gravity sewer interceptor main. 4. Perform surface manhole rehabilitation including replacement of frame and cover on forty- eight (48) manholes along the 36-inch gravity sewer interceptor main. Each proposal shall be accompanied by a cash deposit or certified check, drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, in an amount equal to not less than five percent (5%) of the proposal. In lieu thereof, the Bidder may offer a Bid Bond of five percent (5%) of the Bid prepared on the Bid Bond form contained within the Contract Documents or a Surety Company's Standard Bid Bond form, duly executed by the Bidder as principal and executed by a Surety company licensed under the laws of the State of Tennessee to execute such bonds and listed in the latest issue of U. S. Treasury Circular 570, conditioned that the Surety will, upon demand, forthwith make payment to the obligee upon said bond if the Bidder fails to execute the Contract in accordance with the Bid Bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the Successful Bidder to execute the Contract within ten (10) days after the award or to give satisfactory surety as required by law. All questions must be submitted in written form to W.K. Dickson & Co., Inc. (address above) or to rblake@wkdickson.com. The deadline for submitting questions is seven (7) days prior to bid. No Bid may be withdrawn after the scheduled closing time for the receipt of Bids for a period of ninety (90) days. Bidders must comply with the President's Executive Order No. 11246, as amended, which prohibits discrimination in employment regarding race, creed, color, sex or national origin. The Owner reserves the right to reject any or all Bids and to waive informalities and technicalities.

Bid Results

Water / Sewer

$7,963,300.00

Public - City

Site Work

11

15

13

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
44
Bidding Soon
574
All Active Projects
258
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2022

December 14, 2022

img_map_placeholder

444 Old Knoxville Hwy, Sevierville, TN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

36-Inch Sanitary Sewer Interceptor Rehab

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.