BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Detroit, Michigan. Contact the soliciting agency for additional information.

Written inquiries must be received via email by 12:00 p.m. October 27, 2022. Inquiries must be submitted to: procurement.questions@detroitk12.org with "RFP 23- 0111" in the subject line. Telephone inquiries will not be accepted. All questions germane to the proposal and deemed requests for clarification shall be submitted in writing no later than the timeframe stated to allow sufficient time for answers to be considered and prepared by the District. Detroit Public Schools Community District approved a 20-year Facility Master Plan and vision, identified to continue to maximize use of the District's school buildings, improve overall condition of schools through some new school buildings and renovations to existing buildings. The Facility Master Plan also includes demolition of buildings identified in the Plan. Detroit Public Schools Community District is seeking design services for the first series of projects for the Facility Master Plan. The Facility Master Plan Series 1 (FMP 1) consists of multiple projects: New Build Construction (K-8) - FMP Series 1 -Project A Carsten (K-8) - 500 student capacity approximately 75,000 SF Paul Robeson Malcolm X (K-8) - 500 student capacity approximately 75,000 SF New Build Construction (High Schools) - FMP Series 1 -Project B Pershing High School - 600 student capacity approximately 125,000 SF Renovations - FMP Series 1 -Project C Davis Aerospace relocation to City Airport Renovation - 250 student capacity approximately 95,000 SF Addition - FMP Series 1 -Project D Southeastern Annex Addition - 10,800 additions to existing Southeastern High School for manufacturing and including a new parking lot Demolitions - FMP Series 1 -Project E Golightly Career and Technical Center and Davis Aerospace approximately 133,000 SF Thurgood Marshall approximately 90,000 SF Pershing High School - approximately 250,000 SF Carstens approximately 130,000 SF Paul Robeson/Malcolm X approximately 48,000 SF Attend pre-bid meetings held at the project. Include attendance at bid openings. Bid Tabulations will be prepared by the Construction Manager. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$129,200,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
211
Bidding Soon
2,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

Project location map

Multiple Locations, Detroit, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.