BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a water / sewer project in Bryan, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

October 28, 2022 @ 10:00 a.m. CST - Deadline for written requests for clarifications October 31, 2022 - Deadline to Issue Final Addendum Pursuant to Chapter 2269 of the Texas Government Code and other applicable law, the The City of Bryan (the "City") is soliciting Competitive Sealed Proposals from qualified firms interested in providing construction services in connection with the construction of a 2 million gallon elevated storage tank (the "Project"). Project Location: 6100 Chick Lane, Bryan, TX 77807 1. Furnishing, installing, and providing all labor and materials to construct a new 2-milliongallon composite elevated storage tank and appurtenances. 2. Furnishing, installing, and providing all labor and materials to install approximately 175 ft of 24-inch diameter potable water buried piping, connection to the existing 24-inch water line along Chick Lane, adjustments to existing piping and installation of an automated control butterfly valve in a vault on the existing 24-inch water line along Chick Lane. 3. Furnishing, installing, and providing all labor and materials to install associated structural, automation, and electrical work to complete new installation of elevated storage tank. 4. Furnishing, installing, and providing all labor and materials to install associated site preparation, grading, concrete paving, fencing, and site improvements. 5. Furnishing, installing, and providing all labor and materials to install, maintain, and remove temporary sedimentation, erosion, and traffic controls. 6. Furnishing, and providing all labor and materials to clean, pressure test, and disinfect the new facilities prior to establishing tie into the potable water distribution system. Completion- 540 calendar days

Bid Results

Water / Sewer

$6,476,000.00

Public - City

New Construction, Site Work

32

45

16

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
78
Bidding Soon
3,062
All Active Projects
1,049
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 2, 2023

img_map_placeholder

6100 Chick Ln, Bryan, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.