BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in White Hall, Arkansas. Contact the soliciting agency for additional information.

GENERAL INFORMATION: 1.1 Overview: This is a non-personal services contract to provide semi-annual preventative maintenance and calibration services on QEF conditioning Chambers F-40-CHMV-705-705 (serial number 35119 and SM-32-3800 (serial number 34539) as described in this Performance Work Statement (PWS) at Pine Bluff Arsenal (PBA). The U.S. Government (USG) shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be solely accountable to the Contractor; who, in turn is responsible to the USG. 1.2 Description of Services: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the services defined in this PWS except for those items specified as USG furnished property and services. The contractor shall perform to the standards in this contract. The Contractor shall follow the appropriate OSHA Regulations, Army and Arsenal Regulations. 1.3 Objective: Ensure the two QEF Conditioning Chambers receive timely and technically sufficient preventative maintenance, calibration and equipment repair to ensure properly functioning conditioning chambers at all times. 1.4 Period of Performance: The period of performance shall be for one base year of 12 months and one 12-month option. Base period Date of Award - 365 Days after award Option Year I 366 days after Start of Work - 730 days after start of work 1.5. General Information: 1.5.1. Quality Control: The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which it assures that all work product complies with the requirement of the contract. The QCP shall be delivered with the proposal. The QCP shall be submitted to the KO and COR within five working days of any modification thereafter. 1.5.2 Quality Assurance: The USG shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the USG must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The method of contractor selection has not been determined at this time.

Conceptual

Military

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
44
Bidding Soon
523
All Active Projects
211
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2023

April 24, 2024

img_map_placeholder

Hoadley Rd, White Hall, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.