BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Whittier, California. Completed plans call for the renovation of a educational facility.

La Colima Elementary School MPR HVAC Project. Each Bidder for Elementary School MPR HVAC Projects Bid Package #1 shall be a licensed Mechanical/HVAC contractor pursuant to the California Business and Professions Code, must possess a valid Class C20 License or equivalent at the time of bid and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. The successful bidders must be registered with the State Department of Industrial Relations and have the appropriate, current California contractor's license, as indicated above, for the scope included in the bid, prior to submitting a bid . Question Deadline 10/27/2022 at 10:00 AM PT If you have any questions, please contact kristopher bean with ewcsd at kbean@ewcsd.Org. Bid identification names and numbers for bid package #1; byr23004 evergreen elementary school mpr hvac project byr23005 orchard dale elementary school mpr hvac project byr23006 la colima elementary school mpr hvac project byr23007 ocean view elementary school mpr hvac project byr23008 laurel elementary school mpr hvac project project scope: The installation of new hvac systems inside elementary multipurpose room buildings. . Bids left at the reception desk of the district's main office or delivered anywhere other than the facilities office shall be considered undelivered". Trade contractor bids shall be submitted in a sealed envelope, identifying the project total broken down by each contract site. Any bid received after the time indicated will be returned unopened. The district reserves the right to reject any and all proposals or to waive any irregularities or informalities in any proposal or in the bidding process. No bidder may withdraw any bid for a period of five (5) days after the date set for the opening of bids. Potential applicant firms are directed not to make personal contact with any member of the east whittier city school district board of education. Failure to abide with this requirement will result in the offending proposer's proposal either being disqualified or terminated if discovered after receiving board approval. East whittier city sd reserves the right to postpone the date and time for submission of bid. The successful bidder shall commence work with the issuance of the notice to proceed and complete all work within the time period and milestones from the official start date as illustrated in the bidding documents. The east whittier city sd has established a liquidated damage rate of $2,000 per calendar day for each and every calendar day that the work remains uncompleted or unaccepted by the district. Bid must conform to the requirements of the contract documents. RTICLE I - SCOPE OF WORK: The Trade Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and shall coordinate and sequence Trade Contractor's Work under the Direction of the District on the Project to perform and complete all Work required in connection with Trade Contract Number ELEMENTRY SCHOOL MPR HVAC PROJECTS BID PACKAGE #1 in strict accordance with the Contract Documents enumerated in Article 7 below. The Trade Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Trade Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), orrepresentative of any of them, unless such act or omission actually prevents the Trade Contractor from fully complying with the Contract Documents and the Trade Contractor protests, in accordance with the requirements of the Contract Documents, that the act or omission is preventing the Trade Contractor from fully complying with the Contract Documents. Such protestshall not be effective unlessreduced towriting and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Trade Contractor from fully complying with the Contract Documents.

Award

Educational

$520,000.00

Public - City

Renovation

187

5

2

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
109
Bidding Soon
2,298
All Active Projects
906
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

11225 Miller Rd, Whittier, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.