BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Holden, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 21, 2022 , this project has not yet been awarded. The project is expected to be awarded this week. DPW Facility Material Storage Area Full Depth Reclamation, Grading, and Paving Contractor Qualification Highway Division The RAM is for the decades old release of mineral oil and small chromium metal shavings in the paved area. The reclaimed material will remain entirely on site, with minimal amount of grading to occur beyond reshaping of the reclaimed material. No special protections or actions are anticipated for working within the area.

Bid Results

Roads / Highways

$136,499.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
726
Active Projects
398
Bidding Soon
4,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

December 5, 2022

Project location map

Multiple Locations, Holden, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.