EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Yakima, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Constructing, maintaining and removing temporary crossovers and detour roadways, removing existing concrete overlay, scarifying concrete surfaces, bridge deck repair, furnishing, placing curing and texturing a modified concrete overlay on the three bridges, expansion joint modification on two bridges, removing existing sign bridge and corresponding illumination system, furnish and placing a new sign bridge, installing roadway delineation, placing slope protection rock, bark and wood mulch and landscaping plants, signing, traffic control and other work. Involves 84 items and 150 working days. Work class 6. Estimated value $7,500,000 - $10,000,000 Contact Scott Golbek Project Engineer scpeonorthmail@wsdot.wa.gov The bridge deck on Gordon Rd Bridge is showing signs of fatigue. Repair and resurface the existing bridge deck to maintain the structural integrity, continue safe operation of the highway and extend the life of the bridge. As of February 01, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2022. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - US 12 / Gordon Rd Bridge WB - Deck Rehabilitation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$9,823,287.00

Public - State/Provincial

Paving, Site Work

112

11

16

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
25
Bidding Soon
289
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

July 3, 2023

img_map_placeholder

US-12, Yakima, WA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.