Renovation of an educational facility in Goleta, California. Completed plans call for the renovation of a educational facility.

**As of December 19,2022 project was awarded to Scott and Sons Electric, but awarded amount is not available.** REQUEST FOR PROPOSALS FOR LEASE LEASEBACK CONTRACTOR The Santa Barbara Unified School District ("District") is seeking statements of qualifications and proposals from qualified persons or entities ("Responders") to perform preconstruction services (including constructability review and value engineering) and construction services for the project specified below, utilizing the lease-leaseback delivery method ("LLB"), as set forth in Education Code section 17406, and related statutes. SECTION 1: PROJECT-SPECIFIC INFORMATION AND REQUIREMENTS A. PROJECT INFORMATION The District is a public school district which serves approximately 15000 students at 22 elementary and junior and senior high schools. A list of sites and District information is available on the District portalThe details of this project are as follows ("Project"): PROJECT DETAILS: Location: Dos Pueblos High School, 7266 Alameda Avenue, Goleta, CA 93117 Description of the Work: Replacement of 4160 volt electrical service with 480 volt electrical service. Architect of Record: Kruger Bensen Ziemer Architects Inc. Funding Source: Measure I 2016 Bond Funds Scheduling: Summer 2023 License Requirements: CSLB (C-10) Electrical Contractor Deadline for Questions 11-7-2022 Issuance of Addendum/Answers to Questions on District portal 11-14-2022 Contract Award 1-10-2023 PROJECT - SPECIFIC PREQUALIFICATION REQUIREMENTS In addition to the pre-qualifications set forth below, the District is requiring the following additional pre-qualification requirements for this Project: Contractor will demonstrate substantial experience in the delivery and successful completion of Electrical Service upgrade/replacement projects of similar scope (removal of existing electrical service, transformers & substations. Installation of new electrical service, switchboards, transformers & distribution), type and complexity and projects under the authority of California's Division of the State Architect (DSA) A. INTRODUCTION The successful Responder will enter into a set of LLB contracts with the District (including a Site Lease and Facilities Lease) (cumulatively, the "LLB Contract") covering both preconstruction and construction services for the project. The successful Responder will work under the direction of District staff, and in cooperation with the project architect and other District consultants. The successful Responder will be that which provides the best value to the District, based on evaluation of the criteria set forth herein, and taking into consideration the Responder's demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required. This RFP describes the Project, the required services, the selection process, and the minimum information that must be included in the proposal. B. INTERVIEWS Responders of the District's choosing may be invited to participate in an interview with a Selection Committee appointed by the District. Interviews will generally consist of the Responder's presentation (not to exceed twenty (20) minutes) and questions posed by the Selection Committee. Total time of each interview will not exceed one (1) hour. Any Responder invited to participate in the interview process shall have present at the interview its anticipated key personnel. C. SCOPE OF SERVICES The selected Responder will be required to perform preconstruction services including: Participate in design and project-team meetings; Review and validate cost-estimates developed by the District's architect; PAGE 4 LEASE LEASEBACK CONTRACTOR - RFP Review the design documents for constructability, scheduling, clarity, consistency, and coordination; Perform a value engineering analysis as directed by the District prior to the final approval of plans by the Division of the State Architect; Create and update a detailed master critical path method Project schedule which includes all milestone dates; Prepare cost-estimates of DSA submittal documents; Provide assistance in construction planning; and Assist in development of construction budget and track budget during course of design. The selected Responder will be required to perform all work necessary to complete the Project (as required by the construction documents) for a guaranteed maximum price ("GMP"). Construction services shall further include, but not be limited to, coordination of inspections and testing, and completion of tasks required for DSA close out. All District projects must comply with Title 24 of the California Code of Regulations and be approved by the Division of State Architect. State-funded projects may have additional procurement or construction requirements, including those imposed or overseen by the Office of Public School Construction. A more specific scope of work shall be negotiated and finalized in the LLB Contract. Pre-qualification questions must be directed to L.M. Sweaney at lynns11s@aol.com or leave a voice message at (909) 337-8302. Prequalification packages must be submitted to L.M. Sweaney & Associates, P. O. Box 3187 Santa Barbara, CA 93130 no later than the date specified herein. (US MAIL ONLY). Faxed or emailed applications will not be accepted. . Any electrical, mechanical and plumbing subcontractors identified in the Proposal or who will perform work on the Project must also be prequalified. The District is not requiring that Responders identify and designate subcontractors who will be performing work on the Project, although Responders may do so. After award of the LLB Contract, and in accordance with Education Code section 17406(a)(4)(B), the selected Responder shall be required to award construction subcontracts with a value exceeding one-half of one percent of the price allocable to construction work in accordance with the following process: 1. Provide public notice of availability of work to be subcontracted in accordance with publication requirements applicable to the competitive bidding process of the District, including a fixed date and time on which qualification statements, bids, or proposals will be due. 2. Establish reasonable qualification criteria and standards. 3. Award the subcontract either on a best value basis or to the lowest responsible bidder. The process above may include prequalification or short-listing. Subcontractors awarded subcontracts as set forth above or otherwise identified in Responder's proposal shall be afforded all the protections of the Subletting and Subcontracting Fair Practices Act (Public Contract Code section 4100 et seq.), as applicable. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Educational

$2,700,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
51
Bidding Soon
800
All Active Projects
364
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 29, 2022

January 30, 2023

img_map_placeholder

7266 Alameda Ave, Goleta, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.