Site work for a water / sewer project in Philadelphia, Mississippi. Completed plans call for site work for a water / sewer project.

Project was awarded to Cain, Inc. for $456,917.25. For the Construction of a United States Department of Agriculture, Natural Resources Conservation Project (USDA-NRCS) assisted Emergency Watershed Protection (EWP) project to relieve erosion hazards, said project being named above Principal items of work are as follows: Pay Item # Description Quantity Unit PARTICIPATING ITEMS S-200-A Mobilization 1.000 LS S-201-A Clearing & Grubbing 1.000 LS S-203-A Unclassified Excavation (PM) 350.000 CY S-203-E1 Borrow Excavation (LVM)(Contractor Furnished) 525.000 CY S-203-F Channel Excavation (PM) 1,700.000 CY S-212-A Agricultural Limestone 0.800 TON S-212-B Commercial Fertilizer (13-13-13) 0.100 TON S-212-F Ammonium Nitrate 0.050 TON S-214-A Seeding 0.400 AC S-215-A Vegetative Materials for Mulch 0.800 TON S-233-A Temporary Silt Fence (Type 1)(AOS 0.15-0.84) 200.000 LF S-815-A Loose Riprap (Size 200lb) 3,782.000 TON S-815-E Geotextile Fabric, Type V, AOS 0.21-0.43 4,741.000 SY 907-237-A003 Wattles, 20" 1,600.000 LF TOTAL PARTICIPATING ITEMS NON-PARTICIPATING ITEMS 02732 4" Dia. Sanitary Sewer Force Main 50.000 LF 02584 Aerial Ditch Crossing-10" Steel Casing (Unsupported) 40.000 LF The Owner (City of Philadelphia, MS) reserves the right to increase, decrease, or delete any pay item to stay within the project budget Contract Time for the project is thirty-five (35) Working Days with a liquidated damages provision of two hundred dollars ($200.00) per Working Day thereafter The Award, if made, will be made to the lowest and best qualified bidder on the basis of the published quantities Plans and specifications are on file in the City Clerk's Office and the Project Engineer's office. This project shall be constructed in accordance with the contract documents and specifications contained within the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction A certified check or Bid Bond equal to five percent (5%) of the total Bid, made payable to the City of Philadelphia, must accompany each Bid proposal All Bidders responding to this Advertisement for Bids must comply with all applicable requirements of Chapters 3 and 5 of Title 31 of the Mississippi Code of 1972, as amended, including, but not limited to, the requirements relative to holding a Certificate of Responsibility and payment of a special privilege tax; both items administered by the Mississippi State Board of Public Contractors. All Bids received shall display the Bidder's Certificate of Responsibility Number on the outside of the sealed envelope containing the Bidder's proposal. The Successful Bidder must provide both a Performance Bond and a Payment Bond (each in the amount of one hundred percent [100%] of the Contract) upon execution of the Contract. No Bidder may withdraw his Bid within Sixty (60) days after the actual date of the opening thereof. Within the limitation of the state law, the City of Philadelphia reserves the right to reject any or all bids received, to waive any informalities or irregularities in the bids received, or to accept any bid that is deemed most favorable to the City of Philadelphia.

Award

Water / Sewer

$456,917.00

Public - County

Site Work

11

14

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
31
Bidding Soon
259
All Active Projects
127
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 6, 2023

img_map_placeholder

MS-15, Philadelphia, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.