EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of a detention facility in Concord, New Hampshire. Completed plans call for the renovation of a detention facility.

81208 Description: Work to include but not be limited to: Remove and replace two Steam Boilers, piping and valves. The Project will include the Discipline(s) of: Mechanical and Electrical. Bidders Should Act Promptly and Submit All Questions in Writing to David W. Goulet, Fax 603/271-3515, E-mail David.goulet@das.nh.gov A bid bond shall be submitted electronically at the time of bid in the amount listed below, payable to, "Treasurer, State of New Hampshire," as security for the execution of the contract. All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. Companies, corporations or trade names, except sole proprietorships must be registered with the Secretary of 5 State (Corporate Division, Telephone No. 603/271-3244) in order to do business with the State of New a Hampshire. Bidders are advised that final bid award, as approved by Governor and Executive Council, and issuance of a notification to proceed with the work, can occur up to 60 days or more after the bid opening date.Per section 00204.18.2, Low Bidder has 10 days after notice of award to submit signed Contract, Certificate of Insurance, and Disadvantage Business Enterprise forms, if required. Bidders must submit a 5% bid security at Bid and must furnish a 100% payment and performance security prior to execution of contract. The right is reserved to waive any informalities in or to reject any or all proposals. NHDOT - Concord

Bid Results

Jails / Prisons

$1,650,495.00

Public - State/Provincial

Renovation

16

13

13

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices, Scales
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
133
Bidding Soon
2,214
All Active Projects
962
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 16, 2023

img_map_placeholder

281 N State St, Concord, NH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.