BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to a mixed-use development in Breckenridge Hills, Missouri. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Sealed bids for Cafeteria Renovation / Addition & New Fitness Center for RITENOUR HIGH SCHOOL to renovate and provide an addition to the second level of the existing Cafeteria and renovate existing spaces into the new Fitness Center will be received by the Board of Education of the Ritenour School District. BOE approval is tentatively set for 8 December 2022. Missouri Division of Labor Standards, Wage and Hour Section, Annual Wage Order No. 29 (St. Louis County), will be subject to objections 30 days from the date of issue. Not less than the prevailing hourly rates of wages as found by the Department of Labor and Industrial Relations of the State of Missouri, or determined by court on appeal, shall be paid to all workmen performing work under this contract. Bidders must provide a sworn affidavit and supporting documentation that affirms participation in a federal work authorization program as well as an affidavit that the bidder does not knowingly employ any person who is an unauthorized alien who will be working on the project. The scope of Interior Work includes wall reconfiguration and new finishes, ceilings, HVAC, lighting & controls, plumbing revisions. Exterior Work includes construction of the building additions, roofing modification, and pavement patching. Alternate work includes the addition of tubular skylights and alternate interior guard and handrails. The Project Schedule calls for Fitness Center work and building additions work to commence immediately upon approval of bid. Cafeteria interior work to begin as soon as possible but maintaining full use of kitchen and Cafeteria seating areas when school is in session. Full project to be completed before start of school 4 August 2023. Access to buildings, parking areas and driveways not a part of construction must be maintained for the project duration. Various times during school testing sessions will require disruptive construction to cease. A full schedule of "quiet days" will be discussed during preconstruction meetings. Bidders shall examine each site to confirm existing conditions & quantities prior to submitting bids. Each proposal shall be submitted in duplicate and include a cashier's check or certified check, or an acceptable bidder's bond, payable to the Owner in an amount not less than 5% of the base bid, as a guarantee that if awarded the contract the bidder will enter into a contract and execute such bonds as required. The Owner reserves the right to reject any or all bids and to waive any technicalities therein.

Award

Educational

$3,903,905.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

85

17

51

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
38
Bidding Soon
808
All Active Projects
314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

December 19, 2022

img_map_placeholder

9100 St Charles Rock Rd, Breckenridge Hills, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.