Published January 24, 2023 at 7:00 PM

Updated May 4, 2024

Site work for a water / sewer project in Burbank, California. Completed plans call for site work for a water / sewer project.

The Citys anticipated cost of permitting, design, and construction is $7,400,000. Pre-Bid Meeting: No Online Q&A Yes Q&A Deadline 12/14/2022 2:00 PM (PST) PROJECT DESCRIPTION: The Water Pipelines Improvements Design-Build project consists of four subprojects, all of which are to be completed through one contract. Subproject A - Upper Country Club Water Distribution Pipeline Replacement Subproject B - Magnolia Water Distribution Pipeline Replacement Subproject C - Hollywood Way Water Transmission Pipeline Clean and Lining Subproject D - Transmission Pipeline Valves Replacement All four subprojects (described in Attachment A) that all need to be substantially complete by November 2024. The City anticipates undertaking a two-step process to select the Progressive Design-Builder for our Pipeline project(s). The first step is the release of this RFQ to solicit SOQs from interested Design-Builders. The City will then evaluate the SOQs based on the Evaluation Criteria listed in this solicitation. Based on this evaluation, the City will short-list no more than three potential Contractors who will be invited to advance to the RFP phase of the process. BWP is a municipal utility serving the needs of the Citys approximately 28,800 customer meters within a service area of 17 square miles. The utility includes 276 miles of pipe ranging in size from 3 inches to 30 inches in diameter. The subprojects will rehabilitate or replace existing water transmission and distribution pipelines and valves. The objective of the RFQu is to identify highly qualified firms who are experienced in the construction of water transmission and distribution main pipelines, cleaning and cement lining water pipelines, and water transmission valve replacements.

Post-Bid

Water / Sewer

$7,400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
529
Active Projects
191
Bidding Soon
3,733
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

July 3, 2023

Project location map

Multiple Locations, Burbank, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.