BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2022 at 7:00 PM

Updated January 25, 2024

Site work and new construction of a pre-engineered storage facility in Amboy, Illinois. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The work shall begin by April 15, 2023 (weather depending) and completed by July 1, 2023. This project is subject to the Prevailing Wage laws in the State of Illinois. May Township reserves the right to reject any or all bids and waive irregularities therein. The 56'W x 64'L x 16'H post frame building will be used for cold storage. May Township will take care of preparing the site. Foundation: Concrete Pier Footings 4' Deep with stainless steel post brackets embedded in the concrete piers or Perma Columns Floor: 7" Reinforced, smooth finish, concrete floor with no drains Saw cut and sealed with densifier/hardener Walls: 3 ply 2x6 Nail & Glue laminated columns on 8' centers 40 year steel, 80,000 psi tensile strength 3' steel wainscoting on all 4 sides 64' of 2' high polycarbonate sidelight on the west wall Roof: 8' Truss spacing 2x4 roof purlins 40 year steel, 80,000 psi tensile strength Continuous vented ridge Condensation control under roof steel Overhangs: 12" Overhang around all sides of the building with vented eaves and nonvented gables. Exterior Doors: (2) 20' x 14' Insulated overhead doors with operator & remote in sidewall (1) 3' x 6'8" Steel insulated walk door with locksetElectric: 200 Amp electric: Remove concrete length of apron and trench to install conduit. Back fill trench & pour 6' concrete over opening. Connect to existing panel & install 200 amp panel. Install (9) LED lights with motion sensors, (2) garage door wiring, (1) exterior GFI outlet, (6) interior GFI outlets, (3) exterior wall packs & (1) 240 volt 60-amp outlet. Wire in walls will be in 3/4 " EMT conduit & wire in ceiling will be MC cable.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$586,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
195
Bidding Soon
2,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

April 21, 2023

Project location map

To Be Determined, Amboy, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.