EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 12, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Los Angeles, California. Completed plans call for the renovation of a municipal facility.

Los Angeles Mission College has new LED fixtures and retrofit kits for our roadway lighting around the main campus. These will need to be installed on the existing poles and wired to existing circuits. The wiring from the power source to the fixtures will be removed and replaced with new conductors of the appropriate type for underground raceways. The net results of this work will be a reduced electrical load per circuit, equal or lower wind loading at each fixture, and equal or lower overall weight at each fixture. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/01/2022 5:00 PM (PDT) PlanetBids Vendor Portal C10 or equivalent for Required Construction Work and registration with DIR including sub-contractors. Scope of work, Los Angeles Mission College has new LED fixtures and retrofit kits for our roadway lighting around the main campus. These will need to be installed on the existing poles and wired to existing circuits. The wiring from the power source to the fixtures will be removed and replaced with new conductors of the appropriate type for underground raceways. The net results of this work will be a reduced electrical load per circuit, equal or lower wind loading at each fixture, and equal or lower overall weight at each fixture.

Bid Results

Municipal

$56,076.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
130
Bidding Soon
2,424
All Active Projects
1,040
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

January 16, 2023

img_map_placeholder

13356 Eldridge Ave, Los Angeles, CA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

LAMC - Upgrade Facilities Emergency Power and Lighting System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.