BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2022 at 7:00 PM

Updated January 25, 2024

Renovation of an educational facility in Dallas, Texas. Completed plans call for the renovation of a educational facility.

The Dallas Independent School District ("District") is soliciting Competitive Sealed Proposals ("CSP") from qualified sources relative to the provision of the following request For Competitive Sealed Proposals ("CSP"). This procurement will be managed under the Dallas ISD Construction Services department. All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP. No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School District's Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. Project no. 21014.101 : The scope of this portion of the renovation will include a new secure vestibule with an 81 square foot addition that will connect the existing vestibule to the existing reception area. All existing exterior building joints and waterproofing seals around windows will be replaced and/or upgraded. A new, digital marquee sign will be installed at the entry of the school. Exterior building wall pack lighting and controls will be replaced. The pavement around the new vestibule area and entry courtyard will be replaced along with the sidewalks connecting the school entry to Maple Avenue. New air-cooled chillers will be installed in place of the existing cooling towers. A new fire alarm system will be installed throughout the building

Post-Bid

Educational

$3,526,256.00

Public - City

Renovation

74

28

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
177
Bidding Soon
3,994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

January 30, 2023

Project location map

5555 Maple Ave, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.