BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of an educational facility in Dallas, Texas. Completed plans call for the renovation of a educational facility.

The Dallas Independent School District ("District") is soliciting Competitive Sealed Proposals ("CSP") from qualified sources relative to the provision of the following request For Competitive Sealed Proposals ("CSP"). This procurement will be managed under the Dallas ISD Construction Services department. All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP. No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School District's Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. Project no. 21014.101 : The scope of this portion of the renovation will include a new secure vestibule with an 81 square foot addition that will connect the existing vestibule to the existing reception area. All existing exterior building joints and waterproofing seals around windows will be replaced and/or upgraded. A new, digital marquee sign will be installed at the entry of the school. Exterior building wall pack lighting and controls will be replaced. The pavement around the new vestibule area and entry courtyard will be replaced along with the sidewalks connecting the school entry to Maple Avenue. New air-cooled chillers will be installed in place of the existing cooling towers. A new fire alarm system will be installed throughout the building

Post-Bid

Educational

$3,526,256.00

Public - City

Renovation

74

28

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
76
Bidding Soon
3,554
All Active Projects
1,297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.