Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 29, 2024 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a municipal facility in Bandera, Texas. Completed plans call for the construction of a 18,454-square-foot, two-story above grade municipal facility.
The Project consists of the construction of a new single story inmate housing addition and a new single story storage addition for Angelina County, Texas, as defined and described in the Specifications and Drawings accompanying this Request for Proposals. The budget for this Project is $8,000,000. B. The Work consists of, but is not limited to: erosion control, site clearing, demolition of existing on-site buildings, excavation, fill, select fill and backfill;site utilities,site lighting; rough and finish grading, and topsoil, grass, mulch and river rock ground cover, landscaping and irrigation system, concrete sidewalks and ramps, asphalt paving, concrete retaining walls; concrete slab-on-grade, concrete topping at second floor, polishing of concrete flooring, exterior stone veneer, cast stone, CMU; millwork (including courtroom millwork), stained wood veneer wall and ceiling panels, wood base, glulam trusses and columns; structuralsteel, miscellaneous metals and metal fabrications, including guardrails and handrails, prefabricated metal interior stairs; dampproofing and waterproofing, caulking and sealants, thermal insulation, flashing and sheet metal, roof hatch; metal roofing, metal wall panels and metal soffit panels, pre-engineered canopies; hollow metal doors and frames, finish architectural hardware, aluminum storefront windows and doors, bullet-resistant window units; drywall and acoustical ceilings, drywall and metalstuds, carpeting, painting and finishing; interiorsignage, miscellaneousspecialties, toilet partitions, bullet-resistant panels; machine room-less elevator, above-ground rainwater collection tanks; and mechanical, plumbing (including automatic fire suppression), and electrical systems.
Bid Results
Municipal
$7,347,777.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2024
May 27, 2024
1212 Hackberry St, Bandera, TX
Related To This Project
Bandera, TX
--
Bandera, TX
Bid Date: Dec 14 2022
Bandera, TX
Bid Date: Jan 06 2023
Bandera, TX
--
Bandera, TX
Bid Date: Apr 06 2022
Bandera, TX
Bid Date: May 04 2023
Bandera, TX
Bid Date: Oct 15 2020
Bandera, TX
Bid Date: Apr 20 2022
Bandera, TX
Bid Date: Oct 12 2022
Fort Worth, TX
--
Dallas, TX
Bid Date: Nov 16 2022
New Braunfels, TX
--
San Juan, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.