BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Renovation of a municipal facility in Windsor, Connecticut. Conceptual plans call for the renovation of a municipal facility.

UPDATE : Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditioning units are located in every class room and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. Design will be completed in FY 25 with construction occurring in FY 26. Project is in Town of Windsor capital budget fy 2025-2030 CIP ____________________________________________________________________________ Update: https://townofwindsorct.com/app/uploads/sites/12/2023/06/CIP-FY24-FY29-ADOPTED.pdf Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditing units are located in every class room and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. Project is included Town of Windsor Fiscal Year 2024-2029 Page no 53 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are Original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditioning units are located in every classroom and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. As of April 19, 2023, this project is included in the Town of Windsor's FY 2023-2028 Budget CIP and funding is allotted for construction in FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$3,404,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
801
Active Projects
396
Bidding Soon
5,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.