Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Renovation of a municipal facility in Windsor, Connecticut. Conceptual plans call for the renovation of a municipal facility.
UPDATE : Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditioning units are located in every class room and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. Design will be completed in FY 25 with construction occurring in FY 26. Project is in Town of Windsor capital budget fy 2025-2030 CIP ____________________________________________________________________________ Update: https://townofwindsorct.com/app/uploads/sites/12/2023/06/CIP-FY24-FY29-ADOPTED.pdf Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditing units are located in every class room and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. Project is included Town of Windsor Fiscal Year 2024-2029 Page no 53 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Funds are requested for HVAC energy improvements. Major components of the existing heating steam system are Original to 1935. The steam boiler was replaced in 1985. One half of the building utilizes steam radiators and through a heat exchanger, the other half is hot water heat. Window air conditioning units are located in every classroom and office. This project entails installation of energy efficient heating and cooling systems, high efficiency low condensing boilers, circulating pumps, new heating cooling unit ventilators, unit heaters, variable refrigerant cooling, DDC Controls, and a high efficiency tankless domestic hot water heater. As of April 19, 2023, this project is included in the Town of Windsor's FY 2023-2028 Budget CIP and funding is allotted for construction in FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$3,404,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Windsor, CT
Related To This Project
Windsor, CT
Bid Date: Nov 15 2022
Windsor, CT
Bid Date: Jun 15 2020
Windsor, CT
Bid Date: Nov 15 2022
Windsor, CT
Bid Date: Sep 23 2022
Windsor, CT
Bid Date: Oct 07 2022
Windsor, CT
Bid Date: Jan 10 2024
Windsor, CT
--
Windsor, CT
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
