BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cincinnati, Ohio. Completed plans call for site work for a water / sewer project.

For furnishing all labor, materials and equipment necessary to complete the project known as John Gray Water Main Replacement Bids must be submitted on the forms in the Contract Documents and other conditions therein described must be met. Each bid must be enclosed in a sealed envelope, clearly marked JOHN GRAY ROAD WATER MAIN REPLACEMENT on the face of the envelope and display the name and address of the bidder. Each bid must be accompanied by the following completed documents: Bid Bond (Certified Check or Cashiers Check for ten percent (10%) of the amount of the bid submitted unless otherwise specified) Non-Collusion Affidavit Affidavit of Non-Delinquency of Personal Property Taxes Bids cannot be withdrawn for a period of ninety (90) days following the bid opening. The City anticipates the contract will be awarded and the notice to proceed will be issued in January 2023. All work must be completed within ONE HUNDRED and EIGHTY (180) calendar days after the issuance of Notice to Proceed. The City of Fairfield reserves the right to reject any or all bids or to correct or waive irregularities in bids should it be deemed in the best interest of the City of Fairfield, Ohio to do so. SUMMARY OF WORK 1.1 This project consists of a one-hundred and eighty (180) day contract covering water main improvements for the City of Fairfield (Owner), Ohio and shall not necessarily be limited to the items and/or quantities set forth in this proposal. Contract to include but is not limited to: abandonment of existing water main(s) on John Gray Road; installation of ~4,400 LF of new 12" class 53 ductile iron pipe with Poly-wrap; installation of ~150 LF of new 8" class 53 ductile iron pipe with Poly-wrap; reconnection of existing water mains to new water mains; installation of new gate valves and fire hydrants; installation and/or re-connection of service lines and vaults; pavement and surface restoration as required; and all other associated work shown on the Construction Plans and Notes and Specifications (attached). 1.2 Estimated costs of the water main improvements are $1,380,000.00

Award

Water / Sewer

$1,153,046.00

Public - City

Site Work

16

5

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
51
Bidding Soon
1,161
All Active Projects
537
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.