Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 25, 2022 at 8:00 PM
Updated January 25, 2024
Site work and renovation of a civil project in Buckeye, Arizona. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Design and construction of a trunk sewer to serve the Eastern most area of the Beloat WWTP service area. This trunk sewer will consist of a 36 inch sewer reducing down to an 27 inch sewer at its Northeastern terminus. The total length of this sewer is approximately 22,000 feet. Utility surveys and potholing of water table in first year budget. This project is in included in the City of Buckeye FY 2022-2023 Capital Improvement Plan (CIP). As of October 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$25,500,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
To Be Determined, Buckeye, AZ
Related To This Project
Buckeye, AZ
--
Buckeye, AZ
Bid Date: May 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
