Site work for a water / sewer project in Donnellson, Iowa. Completed plans call for site work for a water / sewer project.

Donnellson sanitary line has extensive buildup of rust and the line is continuously getting clogged. Per a sanitary scope, the line between the clean out and lamphole cleanout need replaced, approx. 90 feet. The DOT is seeking a plumbing vendor to remove existing 4" cast iron sanitary sewer pipe from clean out to manhole location shown on plan attached and replace with new 4" schedule 40 piping and clean out. Vendor to furnish and install all material required. Work to include excavation, cutting, fittings, infill, new paving, etc. for a fully functioning sewer line repair. New pipe section to maintain a minimum 2% slope or higher to sewer tie in location for proper pipe flow. New schedule 40 pipe to match existing pipe diameter. Assume 4" and confirm on site. All work to comply with current and local codes. Existing concrete and asphalt paving to be removed and replaced with new 6" thick concrete per specification below. All work to be reviewed and tested prior to infill and concrete replacement. Vendor to properly dispose of any removed/demoed debris. Any additional linear footage of sewer line replacement work to be done according to unit pricing. Reference attached site plan, photo, and original plumbing plans. 6" thick Concrete: Concrete mix shall be a C-4WR-C20-S20 (when GGBFS is available) or C-4WR-C20 (when GGBFS is not available and in cold weather). GGBFS is ground granulated blast furnace slag. All mixes shall be from a state certified plant using state certified materials with a basic w/c ratio of 0.420 and a maximum w/c ratio of 0.450. The plastic air content before placement shall be 7.0 +/- 1.5 percent. Finishing shall be accomplished by hand float or by power screed. Sufficient internal and/or external vibration shall occur to remove voids/defects. Care shall be taken to ensure vibration is uniform and does not cause segregation or excessive loss of entrained air. No additional water shall be added to the surface of the concrete during finishing and finishing aids shall not be allowed. Texture shall be applied after finishing and shall be broom finish (to match existing). Curing of concrete shall be accomplished with a white pigmented curing compound on all non-formed surfaces. Curing compound shall be applied as soon as finishing and texturing are complete using a hand sprayer until coverage of the surface is uniform. In cold weather, concrete shall be protected from freezing for 48 hours after placement. Protection is required anytime the temperature is forecasted to be 35 degrees or lower within those 48 hours. Concrete shall not be placed when temperatures are forecasted to be below 25 degrees within those 48 hours. Protection shall be four layers of burlap between two layers of 4 mil plastic. 6" granular fill below concrete: Coarse Aggregate Type A1: Coarse aggregate, Class A crushed stone conforming to Iowa DOT SSHBC - Series 2001, Section 41 2004. Under Concrete Pavement: Compact placed aggregate materials uniformly to achieve minimum 95 percent of maximum density. Unit Price #1: Provide linear foot pricing to remove 4" cast iron pipe and furnish/install 4" schedule 40 piping. Plumbing vendor to remove and properly dispose of all debris. Work to include excavation, cutting, fittings, infill, etc. for a fully functioning sewer line repair. Include concrete removal and replacement in unit price. Contractor to be a licensed plumber in the state of Iowa. Training: License IA Plumber Warranty: 1 year labor warranty Estimated start date: Coordinated with Project Manager upon award once notice to proceed email has been issued. Until the contract is awarded the sole point of contact for this project is Tiffany Stupp (see bid contact information) any and all questions related to this project are to be submitted to Tiffany Stupp through the IONwave Bid system. (See the cut off period for questions) This is project is exempt from state sales tax. Davis-bacon wages do not apply. IADOT - Donnellson Maintenance Garage Sewer Repair

Post-Bid

Water / Sewer

$600,000.00

Public - State/Provincial

Site Work

4

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
20
Bidding Soon
354
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

900 Park St, Donnellson, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.