Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Battle Creek, Michigan. Completed plans call for the renovation of a educational facility.
Bid security in the amount of five percent (5%) of the base bid is required in the form of a certified check, cashiers check, or bid bond payable to Battle Creek Public Schools. The Contractor shall furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder. Bonds may be obtained through the Contractors usual source and the cost thereof shall be included in the Contract Sum. The amount of each bond shall be equal to 100% of the Contract Sum. Question Deadline 11/03/2022 at 12:00 PM ET Inquiries may be made to Mr. Josh Bowman at the email address listed above. Information about the project is available during business hours, 8:00 a.m. - 4:30 p.m. Please make sure you label your email subject: CENTRAL HIGH SCHOOL BOILER REPAIR and use the template provided in Attachment D. Bidder proposes and agrees hereby to commence the Work of the Contract Documents on a date specified in a written Notice to proceed to be issued by the Owner and shall fully complete the work on or before February 1, 2023. Timelines can be flexed if needed based on material availability. 1. Successful bidders must hold a valid certificate of authorization to complete repairs on a pressure vessel (R-Stamp). a. A class II Michigan license allows a licensee to repair a low pressure boiler, a hot water supply boiler, and a fire tube boiler of any pressure and to perform work covered by a class I license. 2. Repairs may be completed during normal working hours 3. It is the responsibility of the selected contractor to plan site logistics and building access with district personnel. 1. Remove a ligament from the tube sheet to aid in tube removal. 2. Remove the old tubes from the boiler. a. Tubes may be removed from the boiler room through an exterior opening and lifted up through steel grating. 3. Clean all accessible scale and buildup from the boiler interior while ligament is removed for easier access. 4. Reinstall the removed ligament. 5. Install new tubes a. Lower new tubes through the same grating into the boiler room. b. Pass the tubes through the front of the boiler to the back of the boiler and set them in place. 6. Roll the tubes into their specific sockets. 7. Bead all installed tubes 8. Perform a hydrotest on the boiler.
Bid Results
Educational
$27,482.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2022
January 9, 2023
100 W Van Buren St, Battle Creek, MI
Related To This Project
Battle Creek, MI
Bid Date: Jan 10 2023
Battle Creek, MI
Bid Date: Nov 15 2022
Battle Creek, MI
Bid Date: Nov 15 2022
Battle Creek, MI
--
Battle Creek, MI
Bid Date: Nov 22 2022
Battle Creek, MI
Bid Date: Nov 08 2022
Battle Creek, MI
--
Battle Creek, MI
Bid Date: Dec 07 2022
Battle Creek, MI
Bid Date: Dec 22 2022
Battle Creek, MI
Bid Date: Sep 29 2022
Battle Creek, MI
--
Battle Creek, MI
Bid Date: Aug 25 2022
Battle Creek, MI
Bid Date: Aug 26 2022
Battle Creek, MI
Bid Date: Oct 25 2022
Battle Creek, MI
Bid Date: Oct 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.