Site work and renovation of an educational facility in Farmington, Connecticut. Completed plans call for the renovation of a 5,000-square-foot educational facility; and for site work for a educational facility.
The work of this contract includes, but is not limited to the following: This is a single Lump Sum Base Bid. Project is "Phase 2" of multi-phase reno of the 21 Spring Lane Facility. Construction Work is limited to site improvements/interior renovations to approx. 5,000 SF of the bldg., limited interior/infrastructure improvements. Site work includes new ADA-compliant walks, with underground conduit, lighting and cameras, to service new walks. Interior improvements include selective demolition, limited masonry, interior wall, frames, doors & hardware, new finishes, signage, and specified specialties and accessories. Spaces include 2 classrooms/labs, offices/conference room/student lounge area and single-use toilet room spaces. Exterior work includes replacement of rooftop mechanical units, limited roof flashing and repairs at clerestory window openings. Project includes renovations to existing fire suppression system via Design/Build by Contractor (subcontractor is responsible Fire Protection as required for the renovation of the intended scope of the existing building is indicated as part of the Scope of Work, to comply with current Connecticut State Fire Safety Code and NFPA 13. The Work shall be Design-Build by Contractor. The Contractor shall engage a fire protection contractor qualified and licensed in the State of Connecticut to develop fire protection hydraulic calculations and shop drawings, prepared, stamped, & signed by a licensed Professional Engineer (P.E.) in the State of Connecticut, to the extent required for modifications based on renovation scope to the existing fire protection system in the building and to perform the Work. This shall apply to the Scope of Work of this Phase 2 project. The Contractor shall include and coordinate all requirements of the Office of the State Fire Marshal (OSFM) and FM Global, and shall submit the CT P.E. stamped and signed hydraulic calculations and shop drawings, along with product submittals and a Work sequence plan including schedule, to the Owner, the design team, OSFM and FM Global for their independent reviews and approvals. Upon approval by all parties, the fire protection contractor shall perform approved Work. The cost of all engineering, coordination, reviews and approvals, including revisions to documents, and if any flow test or other investigatory work is required, shall be included in the Contractor's price. FM Global Form 8 The Engineer reserves the right to reject any work which, in his opinion, has been installed in a substandard, dangerous or unserviceable manner. The Contractor shall replace said work in a satisfactory manner at no extra cost to the Owner. Bidders shall not rely on any verbal clarification of the Drawings and/or Specifications. Any questions shall be referred to the Engineer at least five (5) working days prior to Bidding to allow for issuance of an Addendum. Question Deadline 11/23/2022 at 5:00 PM ET Vendor Q&A Dates
Award
Educational
$1,135,664.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2022
January 30, 2023
21 Spring Ln, Farmington, CT
Related To This Project
Farmington, CT
Bid Date: Nov 17 2022
Farmington, CT
Bid Date: Mar 20 2023
Farmington, CT
Bid Date: Nov 21 2022
Farmington, CT
Bid Date: Dec 06 2022
Farmington, CT
Bid Date: Nov 14 2022
Farmington, CT
Bid Date: Dec 06 2022
Farmington, CT
--
Farmington, CT
--
Farmington, CT
--
Farmington, CT
--
Farmington, CT
Bid Date: Nov 02 2022
Farmington, CT
Bid Date: Oct 06 2022
Farmington, CT
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.