Renovation of a water / sewer project in Saco, Maine. Completed plans call for the renovation of a water / sewer project.
The City of Saco, Maine is requesting qualification statements and a detailed proposal from General Contractors to provide pre-construction and general contracting services for the Saco Water Resource Recovery Facility Upgrade Project using the Construction Manager at Risk (CMAR) method of project delivery. Saco is looking to leverage a CMAR Contractor's input on project design to optimize constructability to maximize project scope within Saco's available funding. Saco intends to fully upgrade its wastewater treatment facility on Front Street from a conventional activated sludge secondary biological treatment facility with a design peak flow capacity of 8.4 million gallons per day (MGD) to an aerobic granular sludge treatment process with upgraded grit removal, solids handling, disinfection, wastewater treatment processes, with redeveloped administrative offices and garage space as further detailed in the Request for Qualifications (RFQ). This Project will raise site areas at least three feet, as defined in the RFQ, to make the facility resilient to flooding from sea level rise. Any questions regarding the RFQ specifications should be directed to Howard Carter, Water Resource Recovery Director, by emailing wrrdupgrade@sacomaine.org or by calling (207) 282-3564. The questions deadline is November 7, 2022 at 3:00 PM EST. Construction Manager shall assist Owner with the management of the Project as set forth in this Agreement. The Project consists of: A full upgrade to Saco, Maine's wastewater treatment facility on Front Street from a conventional activated sludge secondary biological treatment facility with a design peak flow capacity of 8.4 million gallons per day (MGD) to an aerobic granular sludge treatment process with upgraded grit removal, solids handling, disinfection, wastewater treatment processes, with redeveloped administrative offices and garage space as specified in RFQ attachments. This Project will raise site areas at least three feet, as defined in the RFQ attachments, to make the facility resilient to flooding from sea level rise. B. Owner has retained the following as Engineer with respect to the Project's design and other engineering and technical matters: Tighe & Bond. Project Scope The fully upgraded facility will be capable of meeting current and anticipated regulatory requirements of the Federal Clean Water Act and the State of Maine Rules related to wastewater treatment and any other applicable Federal, State, and Local rules, regulations, ordinances, standards, and provisions. The scope of the proposed improvements is conveyed in the attached drawings and includes: o replacement of aging equipment and tankage, o hardening of the site/facilities against sea level rise and flooding from wet weather events, including re-grading and site work associated with elevated road access, and elevating sections of the site, o increasing treated peak flow capacity from 8.4 million gallons per day (MGD) to 12 MGD, o a new headworks building and equipment to improve screening and grit removal, o upgrading the secondary treatment system to an advanced aerobic granular sludge technology with nitrogen removal (AquaNereda), including all piping, equipment and controls, o site and Front Street grading to address tidal flooding, o repurposing of existing tanks for wet weather storage and reduction of CSOs, o disinfection upgrades, o biosolids processing upgrades, o plant access road removal and replacement through the middle of the site, o increasing green space on site, o increasing green space in riverfront public access area, o addition of public bathroom facilities, o hardened walking path in public riverfront area
Post-Bid
Water / Sewer
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2022
January 2, 2023
68 Front St, Saco, ME
Related To This Project
Saco, ME
Bid Date: Aug 31 2022
Saco, ME
Bid Date: Dec 14 2022
Saco, ME
--
Saco, ME
Bid Date: Apr 19 2022
Saco, ME
--
Saco, ME
Bid Date: Jun 09 2022
Saco, ME
Bid Date: Oct 20 2022
Bethel, ME
--
Portland, ME
--
Ellsworth, ME
Bid Date: Nov 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.