BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2023 at 7:00 PM

Updated January 25, 2024

Renovation of a fire / police facility in Winnipeg, Manitoba. Completed plans call for the renovation of a fire / police facility.

This is a Non-Tenant direct with a D4 priority and an X1 qualifier: Seed funding - DESIGN PHASE (2021-2022): SSC would like to improve the cooling efficiency of the SSC Data Centre by using the existing drop ceiling as an AC return plenum. However we recently learned that the FM200 system does not have enough gas to cover the additional space of the drop ceiling (approx 48 lbs). Further, we were advised that FM200 can no longer be installed or refreshed (if there is a discharge) due to the high Global Warming Potential (GWP) of FM200. To adequately protect SSC servers at the RCMP D-DIV, SSC would like to remove the FM200 System and install a new "Clean Agent" system -- Likely Novec 1230. This would also cover off replacing the controls, and removal of all FM200 piping/controls (including option to remove in OCC Room) -- with appropriate fire-panel work (Clear Diagram, logic description etc) of how new System will work in relation to the current 2-phase water suppression (as last resort). Build/Construction Phase likely to occur in 2022-2023. Training provided to local BGIS and SSC. Once new system is operational -- we would like to have Nor-Tec complete the cooling efficiency work / operationalization of the drop ceiling as a return-air duct to the Liebert and other AC's (as possible). BGIS Delivered #GOC01835 By submitting our response to this solicitation, we confirm that we have read and agree to comply with the terms and conditions of this ITT, and we agree to provide, upon request, all documentation without modification as defined in this ITT. BGIS reserves the right to reject our submission should BGIS fail to receive the required documentation. Question Acceptance Deadline: Dec 16, 2022 02:00 PM CST Questions are submitted online: Yes Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Fire / Police

$400,000.00

Public - Federal

Renovation

7

17

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
41
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2022

January 23, 2023

Project location map

1091 Portage Ave, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.