BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Buffalo, New York. Completed plans call for site work for a water / sewer project.

2-601 The Buffalo Public Schools Division of Plant Services and School Planning is soliciting Bids to repair an existing trench drain connected to an oil water separator at the Joseph F. Jones Service Center located at 95 Bailey Avenue, Buffalo NY. Service-Disabled Veteran-Owned Set Aside: No Contract term: Maximum Term End: 06/30/2023 Questions Due*: 11/7/2022 4:00 PM 1. Contractor shall cut and patch approximately 200 linear feet by 6-foot-wide by 8" deep concrete slab on grade. Contractor shall remove all spoils and be responsible for proper and legal disposal. 2. Excavate sub-grade as required to install associated piping. 3. Install owner provided catch basins (total of 6) to be equally spaced along the length of the trench drain. a. Alternate #1: Utilize a prefabricated trench drain furnished and installed by Contractor. This Alternate shall minimize concrete demolition for the installation of the new prefabricated trench drain. 4. Buffalo City School District (BCSD) Plumber assessed the existing condition of the oil water separator (O/W) and has determined to be functional and can remain in service. 5. Contractor shall be responsible to furnish and install all associated piping, couplings, fittings etc. to interconnect to Owner provided catch basins. HDPE pipe 6" diameter. 6. Upon installation of all associated piping and catch basins, Contractor shall perform water test to confirm a leak-free watertight system. 7. Contractor to furnish and install the following for concrete finish work: a. #5 bar 24" long embeds @ 24"o.c. staggered along full length of trench. Minimum of rebar embed depth of 12" into existing concrete. b. #1 stone backfill to be utilized c. 5000 psi, minimum of 8" thick concrete slab on grade with 6x6 10ga. Welded wire mesh to be installed and tied to rebar embeds. d. All new concrete flatwork shall promote positive drainage to new catch basins. All edges of new work abutting existing concrete work shall match adjacent elevations. 8. Contractor shall be responsible for all the required temporary protection to maintain BCSD daily operations of the facilities. This shall include but not limited to the following: a. Always maintain owner provided and installed steel plates to have access to garage lifts. b. Ventilation of garage space c. Required signage and barricades for safety during the duration of the construction project. d. Maintain existing fire alarm system including but not limited to smoke detectors, heat detectors, carbon monoxide detectors, fire alarm pull stations. 9. Contractor shall perform a final broom clean of garage space. More importantly, cleaning shall include wiping down all surfaces, and garage equipment that has construction related dust and debris. BCSD is requiring a thorough cleaning of light fixtures, fire alarm fixtures/ devices and replace any ventilation filters within the garage space. The Work consists of repair of an existing concrete trench drain to interconnect with existing oil water separator. Intent to Bid Due Date: Nov 21st 2022, 12:00 PM EST

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
95
Bidding Soon
2,404
All Active Projects
1,005
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2022

December 21, 2022

img_map_placeholder

95 Bailey Ave, Buffalo, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.